12569
|
Perrine, Wesley A.
|
Addendum Phase I Archaeological Survey of Buffington Road Between SR 14/Roosevelt Highway and Interstate 85, Fulton County, Georgia
|
The purpose of this project is to widen and add turn lanes to Buffington Road between Interstate (I-) 85 and State Route (SR) 14/Roosevelt Highway in Fulton County, Georgia.
|
Fulton
|
2018
|
12584
|
Perrine, Wesley A.
|
2nd Addendum Phase I Archaeological Survey of Low Impact Bridge Program, Mt. Airy Road (CR 196) over Ossahatchie Creek in Harris County, Georgia.
|
The purpose of this project is to replace two structurally deficient steel deck bridges on CR 196/Mt. Airy Road over Ossahatchie Creek in Harris County, Georgia (Figure 1).
|
Harris
|
2019
|
12689
|
Perrine, Wesley A.
|
Phase I Archaeological Survey of Proposed Resurfacing along State Route 27 EA (Lamar Street) and State Route 27WE (Forsyth Street) in Sumter County, Georgia
|
The proposed work will take place along a 2.107-mile section of State Route (SR) 27 EA (Lamar Street) and a 2.062 mile section of SR 27 WE (Forsyth Street) from SR 3/US 19 to the intersection of SR 30 in Americus, Sumter County Georgia (Figure l).
|
Sumter
|
2013
|
12699
|
Perrine, Wesley A.
|
Phase I Archaeological Survey of Proposed Resurfacing along State Route 38/US 84 in Ware County, Georgia
|
The proposed work will take place along a 0.650-mile section of State Route (SR) 38/US 84 in Ware County starting at the intersection of McDonald Street to the intersection of Carswell. A venue (MP 18.503 - MP 19.153) (Figure I).
|
Ware
|
2018
|
12708
|
Perrine, Wesley A.
|
Phase I Archaeological Survey of Proposed Resurfacing along State Route 70 in Douglas County, Georgia
|
The proposed work will take place along a 5.60-mile section of State Route (SR) 70 in Douglas County from the Chattahoochee River to the Chattahoochee River (MP 0.00 - MP 5.640) (Figure I). The proposed work consists of milling.
|
Douglas
|
2018
|
12809
|
Williams, Siska, Perrine, Wesley A.
|
Archaeological Assessment of Two Surplus Parcels in Jones County, Georgia
|
The proposed project consists of the transfer of two surplus property parcels currently owned by GDOT. An interested member of the public has contacted GDOT’s Right-Of-Way office requesting to purchase these two surplus land parcels from GDOT.
|
Jones
|
2019
|
12967
|
Perrine, Wesley A.
|
Second Addendum Phase I Archaeological Survey for the Monticello Bypass from State Route 16 to State Route 83, Jasper Country, Georgia
|
Project Description: The proposed project would consist of the Northeast Monticello Bypass from the intersection of State Route (SR) 16 north to SR 83 in Jasper County, Georgia.
|
Jasper
|
2011
|
12999
|
Perrine, Wesley A.
|
Phase I Archaeological Survey and Assessment of the Russell & Peter’s Brewery Cave, 9BI236 in Bibb County, Georgia
|
In compliance with Section 106 of the National Historic Preservation Act of 1966, under 36CFR800.13(b)-Post-Review Discoveries, archeologists with the Georgia Department of Transportation (GDOT) conducted an addendum Phase I archaeological survey to document and evaluate a previously unrecorded c
|
Bibb
|
2018
|
13056
|
Perrine, Wesley A.
|
Addendum Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 049- 5037-0, Ralph Davis Road over Long Branch Tributary, Charlton Country, Georgia.
|
The purpose of this project is to replace Bridge 049-5037-0 carrying County Road (CR) 52, Ralph Davis Road over Long Branch Tributary in Charlton County (Figure 1). The existing Right-of-Way (ROW) measures approximately 80 feet from centerline. The bridge is 70 feet long.
|
Charlton
|
2018
|
13082
|
Carlock, Michael D., Perrine, Wesley A.
|
Phase I Archaeological Survey for Surplus Property PM#3429, Union County, Georgia
|
The purpose of this project is to survey the 8.749 acre surplus Right of Way (ROW) parcel PM#3429 owned by the Georgia Department of Transportation (GDOT) for cultural resources prior to the transfer to a new property owner.
|
Union
|
2018
|