7856
|
Rock, Carolyn, Stallings, Patricia F.
|
Phase I Cultural Resources Survey of the Rail Car Loading Facility Tract, Chatham and Effingham Counties, Georgia
|
Between 16 and 19 December 2013, Brockington and Associates, Inc. conducted an intensive Phase I cultural resources survey of the proposed Rail Car Loading Facility project area in Chatham and Effingham Counties, Georgia.
|
Gordon
|
2014
|
8144
|
Rock, Carolyn
|
Archaeological Monitoring at the Kings Bay Plantation Site Camden County, Georgia
|
Building foundation and utility trench excavations in the vicinity of the Kings Bay Plantation Site (9CAM172), Kings Bay Naval Submarine Base, Camden County, Georgia, were monitored by an archaeologist between June and October, 1984.
|
Peach
|
2014
|
8235
|
Rock, Carolyn
|
Phase II Evaluative Testing at Site 9CH1199
|
In April 2014, Garrett Machine, Inc. contracted with Brockington and Associates, Inc. to conduct Phase II archaeological testing of Site 9CH1199, located in Chatham County, Georgia.
|
Fayette
|
2014
|
8236
|
Rock, Carolyn, Sherard, Jeffrey L.
|
Phase II Evaluative Testing at Site 9TE123
|
In September 2014, Georgia Power Company ( GPC) contracted with Brockington and Associates, Inc. to complete Phase II archaeological testing at Site 9TE123, located in central Terrell County, Georgia.
|
Fulton
|
1952
|
8467
|
Rock, Carolyn
|
Archaeological Survey, Proposed Dean Forest- Cemetery Hill 230kV Transmission Line, Chatham County, Georgia
|
The proposed project consists of construction of a 230 kV overhead transmission line supported by a series of concrete or steel monopoles. The project corridor is approximately 3.2 km (two miles) long by between approximately 9 m (30 ft) and 30 m (100 ft) wide.
|
Newton
|
2014
|
8731
|
Rock, Carolyn
|
Phase I Cultural Resources Survey for the Belles Ferry Dock Project
|
The project is located at the existing floating dock system utilized by the Savannah Belles Ferry vessels on the waterfront north of City Hall and River Street in Savannah, Georgia.
|
Chatham
|
2013
|
8813
|
Rock, Carolyn
|
Phase I Archaeological Survey of the Proposed Carver School Road Borrow Pit Tract
|
Between October 29 and November 3, 2015, Brockington and Associates, Inc. (Brockington) completed a Phase I archaeological survey for the 37-acre (15-hectare) tract of the proposed Carver School Road Borrow Pit project located in Bryan County, Georgia.
|
Muscogee
|
2004
|
8898
|
Rock, Carolyn
|
Pnase I Cultural Resources Survey for the Addendum to the Frank Cochran Drive Widening Project
|
This addendum to the project consists of incorporating a water quality pond to treat storm water generated by the section of Frank Cochran Drive located on Fort Stewart.
|
Jackson
|
1995
|
9325
|
Rock, Carolyn
|
Cultural Resources Literature Review and Reconnaissance Sibley - Plum Creek GRAD Tract Baldwin County, Georgia
|
Between January 1 and 12, 2016 Brockington and Associates, Inc. (Brockington) conducted a Cultural Resources Literature Review and Reconnaissance o f a proposed 1,643-acre (665-hectare [ha]) development tract in Baldwin County. Georgia. Figures I and 2 provide the project location.
|
Baldwin
|
2016
|
9681
|
Rock, Carolyn
|
Phase I Cultural Resources Survey of the Proposed Bradley Point Road Sidewalk Corridor Chatham County, Georgia
|
Between 26 and 30 October, 2015, Brockington and Associates, Inc. (Brockington) conducted an intensive cultural resources survey of the proposed Bradley Point Road Sidewalk project corridor located in southeastern Chatham County, Georgia.
|
Chatham
|
2015
|