Back to top

Gardner, Jeffrey W.

Report Number Author(s) Title Abstract Summary County Year
1085 Gardner, Jeffrey W. Archaeological Resources Survey and Evaluation of the Proposed Robins Air Force Base Gas Pipeline Corridor

Brockington and Associates, Inc., conducted cultural resources survey and archaeological site evaluation of the proposed Robins Air Force Base (RAAB) gas pipeline between 17 and 21 May 1993.

Houston County, GA 1993
1088 Gardner, Jeffrey W., O'Donnell, John B. Archaeological Resources Survey and Evaluation of the Proposed State Route 22/U.S. Highway 80 Widening and Reconstruction

Brockington and Associates, Inc., conducted survey and evaluation of archaeological resources for the proposed widening and reconstruction of State Route 22/US Highway 80 during February 1993.

Muscogee County, GA 1993
1090 Gardner, Jeffrey W., Roberts, Marian D. Archaeological Resources Survey and Evaluation of the Proposed Parker Road Widening and Construction

Brockington and Associates, Inc. conducted archaeological resources survey and evaluation of the proposed Parker Road widening corridor, in Rockdale County, Georgia.

Rockdale County, GA 1993
1092 Gardner, Jeffrey W., Markham, M. Virginia Archaeological Evaluation of Three Sites in the Proposed McIntosh Pipeline Corridor

In June 1993, Georgia Power Company (GPC) contracted with Brockington and Associates, Inc., to conduct archaeological investigations at three sites previously recommended eligible for the National Register of Historic Places (NRHP).

Effingham County, GA 1993
1102 Gardner, Jeffrey W., Markham, M. Virginia Archaeological Resource Survey and Evaluation of the Proposed Costley Mill Corridor

Archaeological survey and evaluation of the proposed Costley Mill Road corridor in Rockdale County, Georgia was conducted in February 1994. The survey corridor includes new right-of-way between State Route 138 and Big Haynes Creek.

Rockdale County, GA 1994
1112 Gardner, Jeffrey W., Brockington, Paul E. North Georgia Hydroelectric Generating Project FERC (#2354)

Resource Inventory I and II [RI-I and RI-II] studies were conducted for the North Georgia Hydroelectric Project in Habersham, Rabun, and Stephens Counties, Georgia, and Oconee County, South Carolina.

Habersham County, GA 1990
1137 Gardner, Jeffrey W., O'Donnell, John B. Archaeological Survey and Evaluation of the Proposed Douglas Boulevard Extension Corridor, Douglas County, Georgia

Brockington and Associates, Inc., conducted archaeological resource survey and evaluation of the proposed Douglas Boulevard Extension corridor in Douglas County, Georgia.

Douglas County, GA 1993
1142 Gardner, Jeffrey W., Reynolds, William M. Archaeological Resources Survey and Evaluation of the Proposed Peachtree Industrial Boulevard/McEver Road Widening and Reconstruction Gwinnett and Hall Counties

Brockington and Associates, Inc., conducted archaeological resource survey and evaluation of the proposed widening and reconstruction corridor for Peachtree Industrial Boulevard/McEver Road in Gwinnett and Hall Counties, Georgia.

Gwinnett County, GA 1993
1233 Gardner, Jeffrey W. Archaeological Survey and Evaluation of a 26 Mile Segment of the Outer Perimeter Corridor Gwinnett, Newton, Rockdale, and Walton Counties, Georgia

Brockington and Associates, Inc. conducted archaeological resources survey and evaluation of a 26 mile segment of the proposed Outer Perimeter corridor in Gwinnett, Newton, Rockdale, and Walton Counties, Georgia.

Gwinnett County, GA 1994
1279 Gardner, Jeffrey W. Archaeological Resources Survey at the Oddfellows Building/Griffin, Georgia

Brockington and Associates, Inc., conducted archaeological resources survey of selected areas associated with the proposed restoration of the Oddfellows Building, in Spalding County, Georgia.

Spalding County, GA 1994
Displaying 11 - 20 of 107