Back to top

Gardner, Jeffrey W.

Report Number Author(s) Title Abstract Summary County Year
1288 Gardner, Jeffrey W., O'Donnell, John B. Archaeological Resources Survey and Evaluation of the Proposed SR 1/US27 Widening and Reconstruction, Stewart and Chattahoochee Counties, Georgia

A cultural resources survey of the proposed widening and reconstruction of State Route (SR) 1/US 27 was conducted 20 July to 24 July 1992, for the Georgia Department of Transportation.

Chattahoochee County, GA 1993
1389 Gardner, Jeffrey W. Archaeological and Historical Evaluation of the Plant McIntosh Combustion Turbine Site (3), Effingham County, Georgia

Archaeological and historical evaluation of the proposed 52.4 acre Plant McIntosh Combustion Turbine Site (3), in Effingham County, Georgia, was conducted for Savannah Electric and Power Company.

Effingham County, GA 1991
1400 Butler, C. Scott, Gardner, Jeffrey W. Archaeological Survey of the 11.94 Acre Holbrook Tract

Archaeological survey of the 11.94 acre Holbrook Tract, in Hart County, Georgia, was conducted by Brockington and Associates, Inc., during April 1992.

Hart County, GA 1992
1402 Southerlin, Bobby G., Gardner, Jeffrey W. Archaeological Survey of the Proposed Transco/Hartwell Combustion Turbine Site

Archaeological survey of Transco Energy Ventures Company's proposed 186 acre Hartwell Combustion Turbine tract, in Hart County, Georgia, was conducted by Brockington and Associates, Inc., during August 1991.

Hart County, GA 1992
1412 Gardner, Jeffrey W. Archaeological Testing at the Fielder-little Farmstead (9Pm990)

Archaeological testing was conducted at the Fielder-Little farmstead site (9Pm990) during November 1994, by Brockington and Associates, Inc. The site was originally recorded by West Georgia College (1993) during Phase I archaeological survey in the Oconee Wildlife Management Area.

Putnam County, GA 1995
1462 Gardner, Jeffrey W. Verification of 33 Archaeological Sites, Lake Oconee Project (Ferc#2413), Greene, Hancock, Morgan, and Putnam Counties, Georgia

In September 1995, Brockington and Associates, Inc. conducted archaeological site verification of 33 previously recorded sites in Georgia Power Company's (GPC) Lake Oconee Project (FERC #2413).

Greene County, GA 1996
1506 Southerlin, Bobby G., Gardner, Jeffrey W. Cultural Resources Survey of the Proposed Brays 46/12 Kv Substation, Washington County, Georgia

Cultural resources survey of Oglethorpe Power Corporation's proposed 2.1 acre (0.85 hectares) Brays 46/25KV substation, in Washington County, Georgia, was conducted by Brockington and Associates, Inc.

Washington County, GA 1992
1587 Smith, Caleb, Gardner, Jeffrey W. Archaeological Survey and Site Evaluation of Proposed Improvements to U.S. 27/SR 1, Troup, Heard, Carroll County, Georgia

Brockington and Associates, Inc. conducted archaeological resources survey and site evaluation of proposed corridor widening segments of US 27/SR 1 in Troup, Heard, and Carroll counties, Georgia between October 1995 and January 1996. The proposed corridor is 28.1 miles long and 250 feet wide.

Carroll County, GA 1996
1616 Gardner, Jeffrey W. Intensive Cultural Resources Survey and Evaluation of Alternative A-1, Proposed Eisenhower Parkway Extension, Bibb County, Georgia.

Cultural resources survey and site evaluation were conducted on 8.53 kilometers (5.3 mi) of proposed new location highway corridor (Alternative A-1), including an interchange, for the Eisenhower Parkway Extension, in Bibb County, Georgia.

Bibb County, GA 1995
1655 Gardner, Jeffrey W. Archaeological Survey Proposed Austell Intermodal Facility, Austell Georgia

Brockington and Associates, Inc. conducted an intensive archaeological survey for the proposed Norfolk Southern Austell Intermodal Facility (Austell Tract) in February and March 1997.

Cobb County, GA 1997
Displaying 21 - 30 of 107