Back to top

Gardner, Jeffrey W.

Report Number Author(s) Title Abstract Summary County Year
6849 Fuller, Elizabeth L., Gardner, Jeffrey W. Phase I Cultural Resources Survey of the Proposed Runway Extension at the Habersham Airport Habersham County, Georgia

Between 29 July and 14 September 2002, Brockington and Associates, Inc., conducted a Phase I cultural resources survey of three tracts totaling 60 acres, adjacent to Habersham County Airport in Cornelia, Georgia.

Wilkes 1976
6970 Smith, Caleb, Gardner, Jeffrey W. Archaeological Survey and Cemetery Delineation of a 100 Acre Tract, Canongate Golf Course, Coweta County, Georgia

Archaeological survey was conducted by Brockington and Associates, Inc. on a 100 acre wooded tract adjacent to the Canongate Golf Course, in Coweta County, Georgia. These investigations were undertaken in compliance with the Regulatory Program of the U.S.

Long 2010
7118 Huddleston, Connie M., Gardner, Jeffrey W. Material Culture and Consumer Choices at Tech Flats: Archaeological and Historical Investigations of the Techwood/Clark Howell Urban Revitalization Tract, Atlanta, Georgia

Archaeological survey and data recovery were conducted by Brockington and Associates, Inc. at the Techwood/Clark Howell Homes Urban Revitalization Tract, in Atlanta, Georgia.

Fulton 1998
7130 Southerlin, Bobby G., Gardner, Jeffrey W. Initial Cultural Resources Evaluation of the Lake Blackshear Project (FERC #659), Crisp, Dooly, Lee, Sumter and Worth Counties, Georgia

The Crisp County Power Commission (CCPC) intends to renew their Federal Energy Regulatory Commission (FERC) license for operating the Lake Blackshear Project (FERC No. 659).

Spalding 2004
7132 Jenkins, David, Gardner, Jeffrey W. Archaeological Resources Survey for the Proposed State Route 70 Bridge Replacement over Camp Creek, Fulton County, Georgia

On 2 April 2003, Brockington and Associates, Inc., conducted an intensive Phase I archaeological resources survey for the proposed State Route (SR) 70 Bridge replacement over Camp Creek in Fulton County, Georgia, under contract with Greenhome & O'Mara, Inc.

DeKalb 2003
7142 Gardner, Jeffrey W., Sutherland, Kit Historic Hydro-Engineering Report: Flint River Project (FERC #1218), Dougherty County, Georgia

This report documents and evaluates the dam, powerhouse, and related facilities and equipment at the Flint River Hydroelectric Project (Flint River Project) in Dougherty and Lee Counties, Georgia, near the City of Albany.

Fulton 2002
7143 Fuller, Elizabeth L., Gardner, Jeffrey W. Phase I Cultural resources Survey of the Proposed Runway Extension at the Hvaersham Airport Haversham County, Georgia

Between 29 July and 14 September 2002, Brockington and Associates, Inc., conducted a Phase I cultural resources survey of three tracts totaling 60 acres, adjacent to Habersham County Airport in Cornelia, Georgia.

Wayne 2004
7145 Jenkins, David, Gardner, Jeffrey W. Cultural resources Survey of the Proposed Dawson Crossing To South Dahlonega transmission Line Dawson and Lumpkin Counties, Georgia

Brockington and Associates, Inc., contracted with the Georgia Power Company to conduct an intensive Phase I cultural resources survey of the proposed 18.3 km (11.4 mi) Dawson Crossing to South Dahlonega transmission line corridor in Dawson and Lumpkin Counties, Georgia.

Walton 2003
7161 Smith, Caleb, Gardner, Jeffrey W. Archaeological Survey and Site Evaluation of Proposed Improvements to US 27/SR 1, Troup, Heard, And Carroll Counties, Georgia

Brockington and Associates, Inc. conducted archaeological resources survey and site evaluation of proposed corridor widening segments of US 27 /SR 1 in Troup, Heard, and Carroll counties, Georgia between October 1995 and January 1996. The proposed corridor is 28.1 miles long and 250 feet wide.

Putnam 2005
7167 Gardner, Jeffrey W., Gougeon, Ramie A. Archaeological Resources Survey and Testing of the Eastern Portion of the Northern Arc

Under a subcontract with Greenhorne & O'Mara (contracting with the Georgia Department of Transportation [GDOT]), Brockington and Associates, Inc., performed an intensive archaeological resources survey (Phase I) within the proposed corridor for the eastern portion of the Northern Arc, Gwinne

Chattahoochee 2004
Displaying 81 - 90 of 107