Back to top

Joseph, Joseph W.

Report Number Author(s) Title Abstract Summary County Year
2549 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey of the I-75/Jodeco Road Interchange Henry County, Georgia

On October 31 2002, New South Associates conducted a Phase I archaeological survey of the proposed 1-75/Jodeco Road interchange improvements in Henry County, Georgia.

Henry 2003
2574 Joseph, Joseph W., Loubser, Johannes H. N. Intensive Archaeological Field Survey of the Proposed Big Horse Creek Bridge Replacement, Telfair County, Georgia

A two-person crew of New South Associates, Inc. conducted a survey of the Horse Creek Bridge replacement on June 5, 2002.

Telfair 2002
2575 Rhodes, Cynthia Gass, Joseph, Joseph W. Phase I Archaeological Survey of Two Proposed Bridge Replacements, Fulton County, Georgia

New South Associates conducted a Phase I archaeological survey of two proposed bridge replacements in Fulton County on May 15, 1998.

Fulton 2002
2586 Joseph, Joseph W., Sheffield, Mason W. Phase I Archaeological Survey of Widening and New Alignment for Skelton Road and Memorial Park Drive Hall County, Georgia

New South Associates conducted a Phase I archaeological survey of the Skelton Road Memorial Park Drive corridor in Hall County, Georgia, October 10 to October 14, 2003. corridor extends 2.41 miles (4.02 kilometers) in total length with a right-of-way width of to 150 feet (30 to 45 meters).

Hall 2003
2588 Joseph, Joseph W., Sheffield, Mason W. Phase I Archaeological Survey of the Proposed Bridge Replacement of Old Atlanta Highway over Wahoo Creek, Coweta County, Georgia

The project consists of a phase I archaeological survey of the proposed bridge replacement on Old Atlanta Highway over Wahoo Creek.

Coweta 2004
2601 Joseph, Joseph W., Sheffield, Mason W. Phase I Archaeological Survey of the SR 15/Curry Creek Bridge Corridor

New South Associates conducted a Phase I archaeological survey of the proposed SRI 5/ Curry Creek Bridge corridor in the city of Jefferson in Jackson County Georgia.

Jackson 2003
2614 Fredericksen, Brody K., Joseph, Joseph W. Phase I Archaeological Survey of the Newnan Bypass Project Coweta County, Georgia

New South Associates conducted a Phase I archaeological survey of the proposed Newnan Bypass in Coweta County from July 10 - July 18, 2000.

Coweta 2000
2616 Joseph, Joseph W., Sheffield, Mason W. Phase I Archaeological Survey of the Bridge Replacement on SR156 over Oothkalooga Creek, Gordon County, Georgia

The project consists of a phase I archaeological survey of the bridge replacement on SRI 56 over Oothkalooga Creek.

Gordon 2003
2621 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey of the Jones, Simpson, Alexander Corridor, Atlanta, Fulton County, Georgia

New South Associates conducted a Phase I archaeological survey of the Jones, Simpson, Alexander corridor in Fulton County on September 25, 2003. The corridor runs along the existing Jones, Simpson, and Alexander streets between Northside Drive and West Peachtree Street in downtown Atlanta.

Fulton 2004
2626 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey of the Thompson Street Alignment Project, City of Douglasville, Douglas County, Georgia

New South Associates conducted a Phase I archaeological survey of the Thompson Street Alignment Project in January of 2003. The study area is the intersection of Thompson Street, West Forrest Avenue, and SR 92/Dallas Highway.

Douglas 2003
Displaying 91 - 100 of 297