1223
|
Blanton, Dennis B., Brockington, Paul E.
|
CRM: Wadley-Wallace Dam 500kv Electric Transmission Line Corridor GP-HK-08: Data Recovery
|
Data recovery excavations at GP-HK-08 were designed to gather data suitable for reaching a more complete understanding of the Lamar period occupation at this upland property.
|
Hancock
|
1986
|
1222
|
Elliott, Daniel T., Brockington, Paul E.
|
CRM: Vogtle Effingham-Thalman 500kv Electric Transmission Line GP-SN-08: Data Recovery
|
Data Recovery was conducted on a portion of a large archaeological site, designated Cultural Property GP-SN-08, Designated Work Area #2, located along Brier Creek in Screven County, Georgia during 1985. This work was performed by Garrow & Associates, Inc.
|
Screven
|
1986
|
1218
|
O'Steen, Lisa Diane, Brockington, Paul E.
|
CRM: Vogtle Effingham-Thalman 500kv Electric Transmission Line GP-SN-03: Data Recovery
|
Cultural property GP-SN-03 (designated (T) 9 Sn C.P. # 11 in Garrow 1984) is located in Screven County, Georgia within the Vidalia Uplands of the Coastal Plain Physiographic Province.
|
Screven
|
1986
|
1216
|
Espenshade, Christopher T., Brockington, Paul E.
|
CRM: Vogtle Effingham-Thalman 500kv Electric Transmission Line GP-SN-13: Data Recovery
|
Data recovery excavations were conducted on a portion of cultural property GP-SN-13, in Screven County, Georgia. Three eight by eight meter blocks were excavated to an average depth of 75 cm.
|
Screven
|
1986
|
1112
|
Gardner, Jeffrey W., Brockington, Paul E.
|
North Georgia Hydroelectric Generating Project FERC (#2354)
|
Resource Inventory I and II [RI-I and RI-II] studies were conducted for the North Georgia Hydroelectric Project in Habersham, Rabun, and Stephens Counties, Georgia, and Oconee County, South Carolina.
|
Habersham
|
1990
|
917
|
Brockington, Paul E., Mitchell, Ruthanne L.
|
Cultural Resources Survey of Marta's Indian Creek Line and Station
|
A cultural resources survey was conducted for the proposed MARTA Indian Creek Line (1.5 miles) and Station (50 acres) in DeKalb County, Georgia. The research effort included historical background review, an architectural survey, and an archaeological survey.
|
DeKalb
|
1989
|
809
|
Blanton, Dennis B., Brockington, Paul E.
|
Archaeological Data Recovery at Cultural Property Gp-Hk-08 in Hancock County, Georgia on the Wadley-Wallace Dam Section of the Plant Vogtle-plant Scherer 500 Kv Electric Transmission Line Corridor
|
Data recovery excavations at GP-HK-08 were designed to gather data suitable for reaching a more complete understanding of the Lamar period occupation at this upland property.
|
Hancock
|
1985
|
756
|
Brockington, Paul E.
|
Resource Inventory II Study Idle Hour Point Access Facility Bartletts Ferry Hydroelectric Project, Harris County, Georgia
|
This Resource Inventory II study project was carried out in advance of proposed construction of a public access facility at Idle Hour Point, on the Bartletts Ferry Reservoir, Harris County, Georgia.
|
Harris
|
1987
|
734
|
Brockington, Paul E.
|
CRM: Vogtle - SC Transmission Line, Burke County, Georgia
|
The Cultural Resource Inventory I and II of the proposed Georgia Power Vogtle - South Carolina Electric Transmission Line, Burke County, Georgia, resulted in the identification of four cultural properties and a single isolate.
|
Burke
|
1985
|
716
|
Elliott, Daniel T., Brockington, Paul E.
|
Archaeological Testing of Portions of Cultural Property Gp-Sn-08, in Screven County, Georgia Within the Proposed Vogtle - Effingham - Thalmann Electric Transmission Line
|
Test excavations were conducted on two Designated Work Areas on cultural property GP-S.N.-08P Screven County, Georgia.
|
Screven
|
1985
|