10998 Joseph, Joseph W., Tankersley, Matthew, Lowry, Sarah Archaeological Evaluation of the Center for Research and Education at Wormsloe (CREW) Construction Site, Wormsloe Plantation Chatham County, Georgia

The University of Georgia (UGA) proposes to develop a one-acre site in the Center for Research and Education (CREW) at the Wormsloe Plantation Historic Site in Isle of Hope, Chatham County. The area is the current home of CREW experimental butterfly gardens.

Chatham 2019
10999 Cultural Resources Survey of the “BENEVOLENCE A” Self- Support Tower Telecommunication Facility Eastman, Dodge County, Georgia Trileaf # 648484

In February 2019, Trileaf Corporation (Trileaf) performed a cultural resource inventory survey for aproposed self-support tower telecommunication facility located in Dodge County, Eastman, Georgia (Latitude: 32° 05' 02.68" N Longitude: -83° 10' 39.73" W).

Dodge 2019
11000 Keith, Scot J., Brannan, Stefan Phase III Archaeological Data Recovery at Sites 9GO375 and 9GO390 on the Center Point-Moss Lake No. 2 Transmission Line

New South Associates, Inc. (New South) conducted Phase III Archaeological Data Recovery Excavation at two sites (9GO375 and 9GO390) on the proposed route of the Center Point-Moss Lake No. 2 transmission line in Gordon County, Georgia.

Gordon 2018
11001 Erickson, Luke W. Archeological Assessment of the Walton County Resurfacing Project

Archeological Assessment of the Walton County Resurfacing Project. This proposed project is 7 .l miles in length and consists of patching, milling and inlay of SR 20 in Walton County beginning at the Gwinnett County Line and ending at the Rockdale County Line.

Walton 2003
11002 Gresham, Thomas H. Report on the Archeological Investigations to Confirm the Location of the Original Beth-Salem Church and Cemetery, Oglethorpe County, Georgia

Beth-Salem Presbyterian Church was founded in December 1785 in a part of Oglethorpe County that was then in Wilkes County. The church hired Rev. John Newton as its first minister in 1786 and probably built a church in that same year.

Oglethorpe 2014
11003 Carroll, Maureen Historic Resources Survey of Project IR-75-2(171) construct bridge over I-75, Bibb County, Georgia

The project consists of constructing a bridge over I-75 approximately one mile northwest of the Pierce Avenue interchange (see project location map).

Bibb 1990
11004 Schoeneberg, Erica Archaeological Assessment of Project STP-M000-00(142), Dooly-Sumter Counties

"ln compliance with Section I 06 of the National Historic Preservation Act of 1966 and amendments thereto, project STP-M000-00(142) in Dooly-Sumter Counties, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Histo

Dooly 1999
11005 Schoeneberg, Erica Archaeological Assessment of Project STP-M000-00(145), Bulloch County

"In compliance with Section I 06 of the National Historic Preservation Act of 1966 and amendments thereto, project STP-M000-00(145) in Bulloch County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Pla

Bulloch 1999
11006 Schoeneberg, Erica Archaeological Assessment of Project STP-M000-00(141), Pulaski County

"In compliance with Section 106 of to be National Historic Preservation Act of 1966 and amendments thereto, project STP-M000-00(141) in Pulaski County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Pl

Pulaski 1999
11007 Crawford, Peggy L. Archaeological Assessment of Project F-012-1(33), Hall County

"In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project F-012 -1(33) , Hall County , has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRH