Report Number Author(s) Title Abstract Summary County Year
14003 Beazley, Matthew, Camirand, Sam Phase I Cultural Resources Survey Proposed 295-Foot (Overall Height) Self-Supporting Lattice Telecommunications Structure Facility TI-OPP-14012 Eastman (FA# 14728225) 74 Rocky Springs Road Eastman, Dodge County, Georgia

Environmental Corporation of America’s client, Tillman Infrastructure, LLC is proposing to construct a 295-foot tall (overall height) self-supporting lattice telecommunications structure located at 74 Rocky Springs Road, Ea

Dodge 2020
14004 Rich, Cori Elise, Bean, Colin Cultural Resources Survey of the “Double_Branches - C” Self-Support Tower Telecommunication Facility, Lincolnton, Lincoln County, Georgia Trileaf # 670123

In August 2020, Trileaf Corporation (Trileaf) performed a cultural resource inventory survey for a proposed self-support communications tower located in Lincoln County, Lincolnton, Georgia (L

Lincoln 2020
14005 Gresham, Thomas H. Archaeological Survey for the Proposed Whitepath 46/25 kV Substation Tract, Gilmer County, Georgia

This report presents the results of an intensive archaeological survey conducted by Southeastern Archeological Services, Inc., in northern Gilmer County, Georgia, where the Georgia Transmission Corporation wishes to construct the White path 46/25 kV substation on a 4.26-acre (1.7-h

Gilmer 2019
14006 Benson, Robert W. Archeological Survey of the Proposed ThumbsUp–Oasis 115kV Transmission Line Project Morgan, Newton, and Walton Counties, Georgia (Southern Survey Area)

In March, April and June 2018, Southeastern Archeological Services, Inc.

Morgan 2019
14007 Benson, Robert W. Archeological Survey of the Proposed Wolf Creek 230/25 kV Substation II, Fulton County, Georgia

From November 4 through 6, 2018 Southeastern Archeological Services, Inc., conducted a Phase I archeological survey of a 17-ha (41-ac) tract in southern Fulton County, where the Georgia Transmission Corporation wishes to construct a substation.

Fulton 2018
14008 Benson, Robert W. Archeological Survey of the Proposed McFarland and Meadows 230/25 kV Substation Tracts Forsyth County, Georgia

In September 2019, Southeastern Archeological Services, Inc., conducted a Phase I archeological survey of two proposed 230/25 kV substations in Forsyth County, Georgia, southwest of Cumming.

Forsyth 2019
14009 Benson, Robert W. Archeological Survey of the Proposed Fieldstone 230/25 kV Substation, Rockdale County, Georgia

In August 2019 Southeastern Archeological Services, Inc., (SAS) conducted a Phase I archeological survey of the proposed Fieldstone Substation, a 1.1-ha (2.8-ac) tract located at the intersection of McCalla and Salem Roads in eastern Rockdale County, Georgia.

Rockdale 2019
14010 Benson, Robert W. Archeological Survey of the Proposed Kibbee Tap 115kV Transmission Line Project Montgomery County, Georgia

In March 2019, Southeastern Archeological Services, Inc. (SAS), conducted a Phase I archeological survey of the Kibbee Tap Transmission Line and proposed access roads in Montgomery County, Georgia.

Montgomery 2019
14011 Gresham, Thomas H. Phase I Cultural Resources Survey of the Proposed Eastside High School Replacement Site, Newton County, Georgia

The Newton County Board of Education wishes to construct a new high school on about 107 acres of wooded land in eastern Newton County (Figure 1). As designed in June, 2019, the project would require impacting 0.44 ac of wetlands for the entrance road into the property.

Newton 2019
14012 Wackett, Joshua, Beazley, Matthew Section 106 Review TCNS ID 204348 Proposed 40-Foot Tall Small Pole Telecommunications Support Structure (Overall Height Including Appurtenances) AT&T Site 00005_017 (FA# 14799560) 52 Perimeter Ctr E Dunwoody, Dekalb County, Georgia ECA Project No. W1232

Environmental Corporation of America’s (ECA) client, AT&T Mobility, LLC is proposing to construct a telecommunications facility as described in the following FCC Form 620, New Tower (NT) Submission Packet.

DeKalb 2020