Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
14028 Shackelford, Wayne, Lively, Hoyt Early Coordination Request for Projects FLF-540(16), FLF-540(17), and NH-16-1(91), Bibb County, Georgia, P.I. Nos. 310980, 363630, and 362695- Eisenhower Parkway Extension

The Georgia Department of Transportation is currently involved in project development for the above noted project. Please find enclosed a set of aerial photographs detailing the proposed projects' area of potential environmental effect.

Bibb County, GA 1995
14029 Alston, Robert L. Archaeological Assessment of Project US-0899(7) Spur, Elbert County, Clearinghouse Doc. No. 75-05-21-19

As a part of the A-95 review process, a survey of this project was made by the staff archaeologist. The alignment is entirely on new location, but it is in an urbanized area.

Elbert County, GA 1976
14030 Etheridge, Van Historic Resources Survey Report and Requests for Determination of Eligibility for South Downtown Connector and Edgewood Avenue, Bibb County, Georgia

The project would begin with the extension of Little Richard Penniman Boulevard from Telfair Street to the· existing Fall Line Freeway.

Bibb County, GA 1997
14031 O'Steen, Lisa Diane, Ledbetter, Jerald Archaeological and Historical Investigations of Portions of Merrell/Curtright Mill Village Sites 9GE37 and 9GE1665 Greene County, Georgia

This report documents the results of archeological data recovery excavations on portions of a mid-nineteenth century cotton mill village in Greene County, Georgia.

Greene County, GA 2009
14032 Gresham, Thomas H. Archeological Site Monitoring at Site 9HY471, Henry County East Lake Road-Jackson Crrek 230 kV Transmission Line

Pursuant to an agreement between Georgia Transmission Corporation (GTC) and the Georgia State Historic Preservation Office reached in a meeting on October 5, 2010, we conducted monitoring of prehistoric archeological site 9

Henry County, GA 2011
14033 Gresham, Thomas H. Signal Upgrades at Nineteen Intersections in the City of Atlanta

The project consists of upgrades and improvements at 19 intersections in downtown Atlanta. Improvements include curb cuts/ADA ramps, new crosswalk striping, and replacing controller cabinets, pull boxes, poles and signalization equipment.

Fulton County, GA 2010
14034 Chieffo, Anthony, Hinson, Lindsey Phase I Terrestrial and Underwater Archaeological Surveys for the Proposed Improvements to SR 26/US 80, Chatham County, Georgia

Edwards-Pitman Environmental, Inc. (EPEI) conducted a phase I archaeological survey for the proposed improvements to state route (SR) 26/United States (US) 80 project (Georgia Department of Transportation [GDOT] P.I. No. 0010560, HP No.

Chatham County, GA 2019
14035 Benson, Robert W. Archaeological Survey for the Proposed SR 1/US 27 from Veterans Highway to Old Dalton Road Improvements Floyd County, Georgia

Southeastern Archeological Services, Inc. (SAS) conducted an intensive archeological survey for proposed improvements of SR 1/US 27 in Floyd County, Georgia.

Floyd County, GA 2010
14036 Finding of No Adverse Effect Lamar Building, Broad Street Historic District, and August Downtown Historic District

The purpose of this project is to enhance the traffic signal performance in Downtown Augusta by upgrading 8 signalized intersections along Broad Street between 5th Street and 13th Street.

Richmond County, GA 2010
14037 Gresham, Thomas H. Beaver Creek 46/25kV Substation, Houston County

At your request we conducted an intensive, Phase I archeological survey for the proposed expansion of the existing Beaver Creek 46/25 kV substation site in central Macon County (Figure 1, Photograph 1).

Houston County, GA 2012