Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
14534 Woodliff, John Dylan ADDENDUM TO PHASE I ARCHAEOLOGICAL SURVEY OF THE PROPOSED KENNESAW MOUNTAIN (KEMO) PEDESTRIAN IMPROVEMENTS IN COBB COUNTY, GEORGIA.

Edwards-Pitman Environmental, Inc.

Cobb 2018
14535 Hinson, Lindsey Phase I Archaeological Survey in Advance of a Proposed Roundabout at the Intersection of SR 22/US Highway 80/Eisenhower Parkway and CR 740/Fulton Mill Road, Macon-Bibb County, Georgia

Edwards-Pitman Environmental, Inc.

Bibb 2019
14536 Bean, Colin, Rich, Cori Elise Cultural Resources Survey of the “Byne Sunshine” Guyed Tower Telecommunications Facility, Millen, Burke County, Georgia, Trileaf # 676054

In July 2020, Trileaf Corporation (Trileaf) performed a cultural resource inventory survey for a proposed guyed communications tower located in Burke County, Millen, Georgia Latitude: 32° 56' 48.65" N,

Burke 2021
14537 Bean, Colin, Vollman, Gwyneth, Lybarger, Jane Cultural Resources Survey of the Cobbham Rd Telecommunication Project, Appling, Columbia County, Georgia Trileaf Project #690789

In January 2022, Trileaf Corporation (Trileaf) performed a cultural resource inventory survey for a proposed self-support lattice communications tower located in Columbia County, Appling, Georgia 

Columbia 2022
14538 Moss, Richard A. Addendum to the Phase I Archaeological Survey of the Proposed SR 316/SR 8/US 29 at CR 929/ Oconee Connector Improvements Project in Oconee County, Georgia

Edwards-Pitman, Inc.

Oconee 2021
14539 Schnitzer, Laura Kate Phase I Archaeological Survey for Proposed Signal Upgrades at Twelve Locations along I-75, SR 42 Spur, SR 54, and CS 3279

The Georgia Department of Transportation (GDOT) plans to make improvements to ten intersections along Interstate (I-)75, State Route (SR) 43 Spur, SR 54 (McDonough Boulevard), and CS 3279 in Fulton County, Georgia under GDOT P.I. No. 0013212. New South Associates, Inc.

Fulton 2020
14540 Gresham, Thomas H. Archaeological Survey of the Learning Ally Parcel, University of Georgia, Athens-Clarke County, Georgia

The University of Georgia is considering using a 0.5 ac parcel of land on which the Learning Ally building is located, on today’s South Hull Street, for future development, which may include 

Clarke 2021
14541 Trudeau, Mary F. Phase II Archaeological Testing at 9SU270, Sumter County, Georgia

Edwards-Pitman, Inc. (EP) conducted Phase II archaeological testing at site 9SU270 in advance of a proposed bridge replacement on County Road (CR) 313/Salters Mill Road over Pessell Creek in Sumter County, Georgia (Georgia Department of Transportation [GDOT] P.I. No.

Sumter 2021
14542 Jennings, Lisa Phase I Archaeological Survey for the Proposed Roundabout at the Intersection of State Route 53 Business and Dragon Drive, Pickens County, Georgia

Edwards-Pitman, Inc. (EP) has completed a Phase I archaeological survey for the proposed roundabout at the intersection of State Route (SR) 53 Business (BU) and Dragon Drive (Dr) in Pickens County, Georgia.

Pickens 2021
14543 Franca, Raphael M. Phase I Archaeological Resources Survey for the Proposed Replacement of the County Road 152/New Hope Road Bridge Over Little Ichawaynochaway Creek, Randolph County, Georgia.

In March 2019, Vanasse Hangen Brustlin (VHB), Inc.

Randolph 2020