3473 |
Banguilan, Alvin J., Silliman, Garrett W. |
Phase I and II Archaeological Investigations of the Proposed Ball Street Extension, Houston County, Georgia |
During April, July, and November 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted Phase I and II archaeological investigations at the proposed Ball Street extension location, Perry, Houston County, Georgia. |
Houston County, GA |
2005 |
3477 |
Banguilan, Alvin J. |
Phase 1 Archaeological Survey of the Chapel Hill Road at Bomar Road and Central Church Road Intersection Improvements, Douglas County, Georgia |
This is a GDOT report short form for negative findings for the Phase I Archaeological Survey of the Chapel Hill Road at Bomar Road and Central Church Road intersection improvements in Douglas county, Georgia. |
Douglas County, GA |
2006 |
3490 |
Banguilan, Alvin J. |
Phase 1 Archaeological Survey of the Stewarts Mill Road at West Stewarts Mill Road/Yancey Road Intersection Improvements Project Area, Douglas County, Georgia |
The proposed project would improve the intersection of Stewarts Mill Road and Yancey Road/West Stewarts Mill Road in Douglas County. The proposed project would adjust the vertical geometry along the southbound approach along West Stewarts Mill Road. |
Douglas County, GA |
2005 |
3491 |
Banguilan, Alvin J. |
Phase 1 Archaeological Survey of the Stewarts Mill Road at Reynolds Road Intersection Improvements Project Area, Douglas County, Georgia |
The proposed project would improve the T-intersection of Stewarts Mill Road and Reynolds Road in Douglas County. Stewarts Mill Road would be widened to accommodate a left turn lane onto Reynolds Road. |
Douglas County, GA |
2005 |
3492 |
Banguilan, Alvin J. |
Phase 1 Archaeological Survey of I-75 Auxillary Lane Project Area, Henry County, Georgia |
This is a GDOT report short form for negative findings for a Phase I Archaeological Survey of I-75 Auxiliary Lane Project Area in Henry County, Georgia. The proposed project would construct an auxiliary lane along the Interstate 75 (I-75) southbound lanes. |
Henry County, GA |
2006 |
3531 |
Banguilan, Alvin J. |
Phase I Archaeological Survey of the SR 138 Extension, Walton County, Georgia |
GDOT proposes to extend SR 138 on new location from U.S. 78/SR 10 Bypass to SR 11. The proposed typical section would consist of two 12-foot travel lanes separated by a 14-foot center turn lane on approximately 150 feet of right-of-way (Figure 2). |
Walton County, GA |
2006 |
3585 |
Banguilan, Alvin J., Pietak, Lynn Marie |
Phase I Archaeological Survey of One Overpass Improvement and Three Interchange Modifications Along I-75, Tift County, Georgia |
In October 2005 and February 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey at four locations along I-75 in Tift County, Georgia. |
Tift County, GA |
2006 |
3613 |
Banguilan, Alvin J. |
Addendum to Phase I Archaeological Survey of the Proposed Bridge Replacement: SR 31 over the Withlacoochee River, Lowndes County, Georgia |
In January 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted additional survey at the site of the proposed bridge replacement at SR 31 over the Withlacoochee River, Lowndes County, Georgia. |
Lowndes County, GA |
2006 |
3616 |
Banguilan, Alvin J. |
Phase I Archaeological Survey of the SR 49 Improvements, Peach County, Georgia |
The proposed project would consist of improvements to SR 49 at industrial Drive and Old Macon Road in Byron, Peach County (Figure 1). |
Peach County, GA |
2006 |
3630 |
Banguilan, Alvin J., Pietak, Lynn Marie |
Phase I Archaeological Survey of the Lester Mill & Bethlehem Roads Improvements Project Corridor, Henry County, Georgia |
In February 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed Lester Mill Road and Bethlehem Road improvements project. The length of the project corridor is approximately 2.5 miles. |
Henry County, GA |
2006 |