3473
|
Banguilan, Alvin J., Silliman, Garrett W.
|
Phase I and II Archaeological Investigations of the Proposed Ball Street Extension, Houston County, Georgia
|
During April, July, and November 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted Phase I and II archaeological investigations at the proposed Ball Street extension location, Perry, Houston County, Georgia.
|
Houston
|
2005
|
3477
|
Banguilan, Alvin J.
|
Phase 1 Archaeological Survey of the Chapel Hill Road at Bomar Road and Central Church Road Intersection Improvements, Douglas County, Georgia
|
This is a GDOT report short form for negative findings for the Phase I Archaeological Survey of the Chapel Hill Road at Bomar Road and Central Church Road intersection improvements in Douglas county, Georgia.
|
Douglas
|
2006
|
3490
|
Banguilan, Alvin J.
|
Phase 1 Archaeological Survey of the Stewarts Mill Road at West Stewarts Mill Road/Yancey Road Intersection Improvements Project Area, Douglas County, Georgia
|
The proposed project would improve the intersection of Stewarts Mill Road and Yancey Road/West Stewarts Mill Road in Douglas County. The proposed project would adjust the vertical geometry along the southbound approach along West Stewarts Mill Road.
|
Douglas
|
2005
|
3491
|
Banguilan, Alvin J.
|
Phase 1 Archaeological Survey of the Stewarts Mill Road at Reynolds Road Intersection Improvements Project Area, Douglas County, Georgia
|
The proposed project would improve the T-intersection of Stewarts Mill Road and Reynolds Road in Douglas County. Stewarts Mill Road would be widened to accommodate a left turn lane onto Reynolds Road.
|
Douglas
|
2005
|
3492
|
Banguilan, Alvin J.
|
Phase 1 Archaeological Survey of I-75 Auxillary Lane Project Area, Henry County, Georgia
|
This is a GDOT report short form for negative findings for a Phase I Archaeological Survey of I-75 Auxiliary Lane Project Area in Henry County, Georgia. The proposed project would construct an auxiliary lane along the Interstate 75 (I-75) southbound lanes.
|
Henry
|
2006
|
3531
|
Banguilan, Alvin J.
|
Phase I Archaeological Survey of the SR 138 Extension, Walton County, Georgia
|
GDOT proposes to extend SR 138 on new location from U.S. 78/SR 10 Bypass to SR 11. The proposed typical section would consist of two 12-foot travel lanes separated by a 14-foot center turn lane on approximately 150 feet of right-of-way (Figure 2).
|
Walton
|
2006
|
3585
|
Banguilan, Alvin J., Pietak, Lynn Marie
|
Phase I Archaeological Survey of One Overpass Improvement and Three Interchange Modifications Along I-75, Tift County, Georgia
|
In October 2005 and February 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey at four locations along I-75 in Tift County, Georgia.
|
Tift
|
2006
|
3613
|
Banguilan, Alvin J.
|
Addendum to Phase I Archaeological Survey of the Proposed Bridge Replacement: SR 31 over the Withlacoochee River, Lowndes County, Georgia
|
In January 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted additional survey at the site of the proposed bridge replacement at SR 31 over the Withlacoochee River, Lowndes County, Georgia.
|
Lowndes
|
2006
|
3616
|
Banguilan, Alvin J.
|
Phase I Archaeological Survey of the SR 49 Improvements, Peach County, Georgia
|
The proposed project would consist of improvements to SR 49 at industrial Drive and Old Macon Road in Byron, Peach County (Figure 1).
|
Peach
|
2006
|
3630
|
Banguilan, Alvin J., Pietak, Lynn Marie
|
Phase I Archaeological Survey of the Lester Mill & Bethlehem Roads Improvements Project Corridor, Henry County, Georgia
|
In February 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed Lester Mill Road and Bethlehem Road improvements project. The length of the project corridor is approximately 2.5 miles.
|
Henry
|