Back to top

Pappas, Andrew A.

Report Number Author(s) Title Abstract Summary County Year
7383 Pappas, Andrew A. Addendum to a Phase I Archaeological Resources Survey of SR 96 from Moody Road to Old Hawkinsville Road/Thompson Mill Road, Houston County, Georgia

Brockington and Associates, Inc. has completed background research and field investigations within the newlyproposedright -of-way(ROW) extension east of the intersection of State Road (SR) 96 and Old Hawkinsville Road/Thompson Mill Road in Houston County, Georgia.

Effingham 2003
7929 Pappas, Andrew A. A Phase I Archaeological Resources Survey of the Proposed Pleasant Hill Neighborhood Streetscape Corridor and Jefferson Long Park, Bibb County, Georgia
Charlton 2011
7931 Pappas, Andrew A. A Phase I Archaeological Resources Survey of the Hoyt Braswell and Purdue Road Widening and Improvements, Jefferson County, Georgia
Paulding 2013
7971 Pappas, Andrew A. Phase I Archaeological Resources Survey of the Chamblee-Dunwoody Streetscape Corridor, DeKalb County, Georgia
Webster 1974
7979 Pappas, Andrew A. A Phase I Archaeological Resources Survey of the SR 92/US 41 Intersection, Cobb County, Georgia

The study area for this project consists of the intersection of State Route 3 (SR 3)/US 41/Cobb Parkway and SR 92/Dallas Acworth Highway located in Cobb County, Georgia.

Haralson 2013
8014 Pappas, Andrew A. Phase I Archaeological Survey of the SR 54 Pedestrian Bridge and Trail, Fayette County, Georgia

The primary purpose of the project is to provide a connection between State Route (SR) 54 and Lester Road through the implementation of a multi-modal system for pedestrians, cyclists, and golf cart vehicles.

Grady 2002
8654 Pappas, Andrew A. A Phase I Archaeological Resources Survey of the SR 5 Improvements From the Wesley Pond Apartments Driveway to Concourse Parkway, Douglas County, Georgia.

The proposed project would consist of operational and traffic flow improvements for approximately 0.6 miles along State Route 5/Bill Arp Road (SR 5) from the Wesley Pond Apartments driveway to Concourse Parkway (see Figure 1: Project Location Map).

Coffee 2010
9287 Pappas, Andrew A. Addendum to a Phase I Archaeological Resources Surveyof the Proposed Widening and Reconstruction of SR92/Dallas Highway

The original project would widen approximately 6.36 miles of existing SR 92/Dallas Highway starting at Malone Road in Douglas County and going north to Nebo Road in Paulding County.

Douglas 2016
9296 Pappas, Andrew A. Phase I Archaeological Survey of the East Point Intersection Upgrades and Streetscaping Improvements, Fulton County, Georgia

The proposed project would consist of upgrading intersections and streetscapes in downtown East Point, Georgia to include provisions for continuous bicycle and pedestrian facilities, as well as to improve travel operations of the corridors proposed for enhancement.

Fulton 2016
9567 Pappas, Andrew A. A Phase I Archaeological Resources Survey of the Proposed South Atlanta Street (SR 9) “Historic Gateway” Corridor Improvements, Fulton County, Georgia

In December 2012, January 2013, April 2015, and June of 2015, AECOM Corporation conducted a Phase I archaeological survey of the proposed 1.3-mile South Atlanta Street (State Route [SR] 9) “Historic Gateway” corridor improvements, which is associated with the GDOT project STP00-9496-00(001), P.I.

Fulton 2017
Displaying 11 - 20 of 71