Pappas, Andrew A.

Report Number Author(s) Title Abstract Summary County Year
12349 O'Connor, Lauren Welch, Pappas, Andrew A. Third Addendum to a Phase I Archaeological Resources Survey of the Proposed Two Interchanges on Interstate 75, SR 7, and SR 122, Lowndes County, Georgia

The proposed GDOT project PI No. 0000762 would reconstruct eh I-75/SR 7 (Shiloh Road/North Valdosta Road) interchange. This would include transitioning Shiloh Road from a two-lane to a four-lane divided roadway with a 20-f00t raised concrete median and rural 6 ½ foot outside paved shoulders.

Lowndes County, GA 2018
12374 Pappas, Andrew A. Addendum to a Phase I Archaeological Survey of the Proposed SR 369/400 Interchange, Forsyth County, Georgia

As documented in a previous Georgia Department of Transportation (GDOT) Archaeological Short Form for Negative Findings (Koch 2016), the proposed project would construct a new grade-separated, cloverleaf interchange at the existing signalized intersection of State Route (SR) 369 and SR 400 in For

Forsyth County, GA 2018
12526 Pappas, Andrew A., Blank, Andrew, Renaud, Lindsey A Phase I Archaeological Resources Survey of the Proposed SR 128 Bridge Replacements at Patsiliga Creek and Its Overflow, Taylor County, GA

GDOT Project Pl No. 0013814 would replace the two bridges carrying State Route (SR) 128 over Patsiliga Creek and its overflow in Taylor County, Georgia. Bridge 269-0018-0 was constructed in 1937 over the Patsiliga Creek overflow, and has a sufficiency rating of 55.0.

Taylor County, GA 2018
12582 O'Connor, Lauren Welch, Pappas, Andrew A. Phase I Archaeological Resources Survey of the Proposed Interstate 20 (I-20) Bridge Replacement Over Big Indian Creek, Morgan County, Georgia

In June 2018, Vanasse Hangen Brustlin, Inc. (VHB) conducted a Phase I archaeological survey of the proposed Interstate 20 (I-20) bridge replacement located in Morgan County, Georgia (PI No. 0014903).

Morgan County, GA 2019
12810 Pappas, Andrew A., Hanks, Matthew L. A Phase I Archaeological Resources Survey of the Proposed South Atlanta Street (SR 9) “Historic Gateway” Corridor Improvements, Fulton County, Georgia

In December 2012, January 2013, April 2015, and June of 2015, AECOM Corporation conducted a Phase I archaeological survey of the proposed 1.3-mile South Atlanta Street (State Route [SR] 9) “Historic Gateway” corridor improvements, which is associated with the GDOT project STP00-9496-00(001), P.I.

Fulton County, GA 2016
12987 Pappas, Andrew A. Phase I Archaeological Survey of the State Route (SR) 81 Widening and Improvements Corridor from Lemon Street to Bethany Road, Henry County, Georgia

In July of 2017, VHB conducted a Phase I archaeological survey along a section of State Route (SR) 81 located in Henry County, Georgia (PI No. 0015089).

Henry County, GA 2018
13073 Pappas, Andrew A., Blank, Andrew Phase I Archaeological Survey of the GDOT Surplus ROW Parcel 135-1423 Gwinnett County, GA

The proposed project consists of the transfer of surplus property in Gwinnett County owned by the Georgia Department of Transportation (GDOT). The surplus property will be placed on the market by GDOT’s Right-of-Way Office.

Gwinnett County, GA 2017
13077 Pappas, Andrew A., Blank, Andrew A Phase I Archaeological Resources Survey of the GDOT Surplus ROW Parcel 121-1046

The proposed project consists of the transfer of surplus property in Fulton County owned by the Georgia Department of Transportation (GDOT). The surplus property will be placed on the market by GDOT’s Right-of-Way Office.

Fulton County, GA 2017
13157 Blank, Andrew, Pappas, Andrew A. A Phase I Archaeological Resources Survey of the CR 742/Bass Road Bridge Replacement Over Norfolk Southern Railroad, Bibb County, Georgia

The Georgia Department of Transportation (GDOT) Project PI No. 0014896 would replace the bridge on County Road (CR) 742/Bass Road over the Norfolk-Southern Railroad in Bibb County, Georgia. The structure was constructed in 1938 and is located approximately two miles west of the City of Macon.

Bibb County, GA 2018
13158 Blank, Andrew, Renaud, Lindsey, Pappas, Andrew A. A Phase I Archaeological Resources Survey of the SR 4 Bridge Replacement Over Spirit Creek, Richmond County, Georgia

GDOT Project Pl No. #0014907 would replace the existing parallel bridges carrying State Route (SR) 4/United States (US) 1 over North Fork Spirit Creek in Richmond County, Georgia (Figures 1 and 2).

Richmond County, GA 2018
Displaying 41 - 50 of 71