VanBuren, Maurie

Report Number Author(s) Title Abstract Summary County Year
4152 VanBuren, Maurie St. George Tap 115kV Transmission Line, St. George 115/25kV Substation, Charlton County, Georgia

In February of 1997, Historic Preservation Consulting was hired by Oglethorpe Power Corporation to conduct a historic resource evaluation of the proposed St. George Tap 115kV Transmission Line and St. George 115/25kV substation project in Charlton County, GEORGIA.

Charlton 1997
7842 VanBuren, Maurie Georgia Transmission Corporation Historic Resources Survey East Georgia College 115/25 kV Substation

This report contains a Project Location Map, which identifies the general location of the study area, and a Project Boundary and Map of Resources Surveyed, which identifies the project boundaries on a USGS Quadrangle map. Numbers on this second map are keyed to survey forms on each resource.

Tift 2013
7851 VanBuren, Maurie Historic Resources Survey Spring Creek 115 kV Substation, Miller County, Georgia

The Spring Creek Historic Resources Survey documents historic resources within the project boundaries identified on the Project Boundary and Map of Resources Surveyed.

Fulton 1997
8029 VanBuren, Maurie Mill Pond Road 115 kV Transmission Line

The week of July 4, 2011, Brockington and Associates completed a background literature review and field investigations for a Phase I cultural resources survey for the proposed approximately 8 acre Mill Pond Road Substation site in Newton County, Georgia (Figure 1).

Glynn 2002
9748 VanBuren, Maurie Report of No Adverse Effect on Historic Resources Woodlore-Battlefield 230 kV Transmission Line

In order to comply with the Section 106 process of the National Historic Preservation Act of 1966, this Historic Resources Evaluation report determines the Area of Potential Effect (APE) of the proposed Transmission Line.

Cobb 2008
9751 VanBuren, Maurie Report of No Adverse Effect on Historic Resources Woodlore 230 kV Substation

In order to comply with the Section 106 process of the National Historic Preservation Act of 1966, this Historic Resources Evaluation report determines the rea of Potential Effect (APE) of the proposed Substation.

Cobb 2008
9803 VanBuren, Maurie Georgia Transmission Corporation Report of No Adverse Effect on Historic Resources Battlefield-Frey Road 230 kV Transmission Line

This report documents that Georgia Transmission Corporation’s Battlefield-Frey Road 230 kV Transmission Line project will not have an adverse effect on historic resources.

Paulding 2008
9805 VanBuren, Maurie Georgia Transmission Corporation Historic Resources Survey Box Springs 230/25 kV Substation Talbot County, Georgia / Project Number P79136

 

Scope of Work:

Talbot 2006
9815 VanBuren, Maurie McConnell Road-Woodlore 230 kV Transmission Line

This report documents that Georgia Transmission Corporation’s McConnell Road-Woodlore

230 kV Transmission Line project will not have an adverse effect on historic resources. The

Transmission Line will begin at the existing McConnell Road Substation on the south side of

Cobb 2008
9842 VanBuren, Maurie Georgia Transmission Corporation Report of No Adverse Effect on Historical Resources Frey Road 230 kV Switching Station

In order to comply with the Section 106 process of the National Historic Preservation Act of

1966, this Historic Resources Evaluation report determines the Area of Potential Effect (APE)

of the proposed Substation. In addition, this report determines the National Register of

Cobb 2008
Displaying 1 - 10 of 11