Back to top

Duff, Eric Anthony

Report Number Author(s) Title Abstract Summary County Year
4687 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project STP-052-2-(18), Barrow County

The proposed project would consist of the construction of an eastern bypass for the city of Winder in Barrow County.

Barrow County, GA 2001
4688 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Projects NH-IM-85-2 (166-174), Barrow, Jackson, Banks, and Franklin Counties

The proposed projects would widen and reconstruct 1-85 from SR 211 in Barrow County northward to SR 17 in Franklin County, for a total length of 46.9 miles. A new lane will be added within the existing median. All proposed work would be done within existing right-of-way.

Barrow County, GA 2002
4694 Duff, Eric Anthony Archaeological Assessment of Project STP-00MS(289), Crisp, Ben Hill, Mitchell, Tift, and Worth Counties

Project STP-OOMS(289) would replace the existing traffic signal systems at intersections in the cities of Cordele, Fitzgerald, Camilla,' Tifton, and Sylvester.

Crisp County, GA 1998
4701 Duff, Eric Anthony Archaeological Assessment of Project EDS-441(30), Banks County

Project EDS-441(30) consists of the widening and reconstruction of US 441/SR 15 from CR 230 to CR 150 in Banks County. Archaeological clearance for the proposed project was completed by GDOT staff archaeologist Bob Entorf in 1987.

Banks County, GA 2000
4703 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project STP-0001-00(574), Bartow County

The proposed project would consist of reconstruction of median crossovers along SR 3/US 41 at various locations in Bartow County. The project begins at the Cobb County/Bartow County Line and proceeds northward to the SR 293 Connector. The total length of the project is 15.15 miles.

Bartow County, GA 2000
4707 Duff, Eric Anthony, Fleming, Sherry Archaeological Assessment of Project BLDG-DIST-6-95(040), Bartow County

The proposed project would consist of the construction of a traffic Signal Headquarters for GDOT District 6 in Bartow County. The project also includes the construction of a driveway for the facility and a chain link fence around the facility.

Bartow County, GA 1995
4708 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project NHS-0000-00-(932), Bartow County

Project NHS-0000-00(932) would replace the existing asphalt ramps with concrete ramps at the 1-75 intersection with US 411/SR 61 in Bartow County. The proposed project would also upgrade the guardrails, turning radii, and acceleration and deceleration lengths.

Bartow County, GA 2002
4709 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project STP-179-1(8), Bartow and Polk Counties

Project STP-179-1(8) would reconstruct a portion of SR 113 onto new location beginning at CR 36 in Bartow County and terminating at the existing SR 113 in Polk County. This proposed project has been subjected to a previous survey by Teresa Paglione in 1991.

Bartow County, GA 2001
4751 Duff, Eric Anthony Archaeological Assessment of Project TSAP-11(208), Ben Hill County

Project TSAP-11 (208) is the proposed construction of a left turn lane and decel lane on U.S. 319/S.R. 11 at the intersection of County Road 124 south of Fitzgerald in Ben Hill County, Georgia.

Ben Hill County, GA 1994
4753 Duff, Eric Anthony Archaeological Assessment of Project BRMLB-2210(1), Ben Hill County

Project BRMLB-2210(1) would replace the structurally deficient bridge over Turkey Creek on CR 246 in Ben Hill County.

Ben Hill County, GA 1996
Displaying 121 - 130 of 695