Report Number Author(s) Title Abstract Summary County Year
4890 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project PR-209(201), Miller County

No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.

Miller County, GA 2000
4891 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project PR-10(201), Miller County

No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.

Miller County, GA 2000
4914 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project EDS-441(32), Jackson County

Projects EDS-441(32) would widen US 441 from just south of the Clarke/Jackson County line to the US 441/SR 334 intersection south of the city limit of Commerce, Georgia. The proposed project was subjected to an archaeological survey in 1995 by Michael Baker Jr., Incorporated.

Jackson County, GA 2001
4925 Duff, Eric Anthony Archaeological Assessment of Project PR-37-1(079), Crawford County

Project PR-37-1(079) in Crawford County allows for grading, drainage, base and surfacing on CR 37 (Cool Springs Church Road) for approximately 2.2 kilometers (1.37 miles). The proposed project on CR 37 would begin at SR 7/US 341 then continue northerly to an end point at CR 52.

Crawford County, GA 1995
4927 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project TSAP-128(13), Crawford County

The proposed project would improve existing drainage structures underneath and adjacent to SR 128 in Roberta, Georgia.

Crawford County, GA 2000
4939 Duff, Eric Anthony Archaeological Assessment of Project STP-164-1(38), Coweta County

The proposed project consists of a symmetrical widening of SR 34 to the inside, changing the existing four lane highway and 19.5 meter (64 feet) depressed grass median to a six lane highway with a 12.1 meter (forty feet) depressed grass median.

Coweta County, GA 1994
4940 Duff, Eric Anthony Archaeological Assessment of Project STP-164-1(39), Coweta County

The proposed project would widen and reconstruct the SR 34 Bypass north of Newnan, from two lanes to four lanes.

Coweta County, GA 1994
4941 Duff, Eric Anthony Archaeological Reevaluation of Project STP-159-1(15), Coweta County, Previously Project FR-159-1(15), Coweta County

The proposed project would reconstruct and widen SR 16/US 27 north of Newnan. The project would begin at a point approximately 121.9 meters (400 feet) south of Evans Drive/CR 677 then extend northerly along SR 16/US 27 to a point approximately 182.8 meters (600 feet) north of the Newnan Bypass.

Coweta County, GA 1994
4943 Duff, Eric Anthony Archaeological Assessment of Project ER-010-1(28), Coweta County

The proposed project would replace a structurally deficient drainage pipe on SR 14/US 29 at mile post 17.5 in Coweta County. The existing right-of-way on SR 14/US 29 is approximately 18.3 meters (60 feet), and no additional right-of-way would be required.

Coweta County, GA 1995
4947 Duff, Eric Anthony Archaeological Assessment of Project BRZLB-077(4), Coweta County

The proposed project would replace the structural)-v deficient single-lane bjid e on C,R 157 over the CSX Railroad in Coweta County. A new bridge would be constructed on new location approximately 55 meters (180 feet) east of the existing bridge.

Coweta County, GA 1996