Back to top

Duff, Eric Anthony

Report Number Author(s) Title Abstract Summary County Year
4521 Duff, Eric Anthony Archaeological Assessment of Project CSNHS-M003-00(897), Coffee County

The proposed project would consist of the resurfacing of SR 3/US 441 beginning at SR 135 then continuing northerly to an end point at CS 787/McNeal Drive in the City of Douglas, Coffee County, Georgia. In addition, ADA compliant ramps would be installed at 27 locations along the project route.

Coffee 2008
4543 Duff, Eric Anthony Archaeological Assessment of Project CSSTP-M003-00(896), Quitman/Randolph Counties

The proposed project would consist of grading, maintenance of driveway/street/road tie-ins, removing and disposing of excavated material (gravel, asphalt, concrete, etc.) to include compaction of sub-grade, and resurfacing on SR 50 in Quitman and Randolph Counties, Georgia.

Quitman 2009
4612 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Reassessment of Project STP-073-2(7), Appling County

Project STP-073-2(7) would consist of widening and reconstructing SR 15. The proposed project would begin at CR 531/Red Oak Road and would terminate at CR 417/Hokie Floyd Road. The total length of the project is 2.86 miles. The existing right-of-way is 100 feet.

Appling 2001
4645 Duff, Eric Anthony Archaeological Assessment of the Proposed Wetland Mitigation Site for Projects EDS-545(16)(33), Bacon/Ware Counties

The proposed wetland mitigation site would include the restoration and enhancement of approximately 44.9 hectares (111 acres) located on a portion of the Echols tract in Pierce County.

Bacon 1996
4649 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project BRSLB-1586(4), Baker County

The proposed project would replace the CR 67 bridge spanning Mill Creek in Baker County. The existing bridge is a 120 foot X 22 foot timber and concrete structure, and would be replaced with a 120 foot X 28 foot concrete structure on existing alignment.

Baker 2001
4651 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project BRZLB-007(2), Baker County

The proposed project would consist of replacing the bridge spanning Chickasawhatchee Creek along CR 121 in Baker County. The existing bridge is a 240' X 22' concrete structure, and will be replaced with a 240' X 28' concrete structure on new alignment just north of the existing bridge.

Baker 2001
4652 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project BRSLB-1630(4), Baker County

The original proposed project would consist of replacing the bridge spanning Big Cypress Creek along CR 124 in Baker County. The existing bridge is a 120' X 24' concrete structure, and would be replaced with a 120' X 28' concrete structure.

Baker 2001
4655 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project BRSLB-1630(4), Baker County

The proposed project would consist of replacing the bridge spanning Big Cypress Creek along CR 124 in Baker County. The existing bridge is a 120' X 24' concrete structure, and will be replaced with a 120' X 28' concrete structure.

Baker 2000
4662 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project NH-089-1(26), Baldwin County

The original proposed project would widen SR 49 from west of Allen Memorial Drive to east of the bridge over Fishing Creek, for a distance of 2.4 miles. Right-of-way along SR 49 is approximately 100 feet; additional required right-of-way varies from 20 to 50 feet.

Baldwin 2001
4668 Duff, Eric Anthony Archaeological Assessment of Project PR-160-1(009), Baldwin County

Project PR-160-1(009) allows for grading, drainage, base and surfacing on approximately 0.96 km (0.598 mi.) of roadway on CR 160. Also, the project includes the construction of a two-way left turn lane to CR 160 on SR 29/US 441.

Baldwin 1994
Displaying 111 - 120 of 695