4521
|
Duff, Eric Anthony
|
Archaeological Assessment of Project CSNHS-M003-00(897), Coffee County
|
The proposed project would consist of the resurfacing of SR 3/US 441 beginning at SR 135 then continuing northerly to an end point at CS 787/McNeal Drive in the City of Douglas, Coffee County, Georgia. In addition, ADA compliant ramps would be installed at 27 locations along the project route.
|
Coffee
|
2008
|
4543
|
Duff, Eric Anthony
|
Archaeological Assessment of Project CSSTP-M003-00(896), Quitman/Randolph Counties
|
The proposed project would consist of grading, maintenance of driveway/street/road tie-ins, removing and disposing of excavated material (gravel, asphalt, concrete, etc.) to include compaction of sub-grade, and resurfacing on SR 50 in Quitman and Randolph Counties, Georgia.
|
Quitman
|
2009
|
4612
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Reassessment of Project STP-073-2(7), Appling County
|
Project STP-073-2(7) would consist of widening and reconstructing SR 15. The proposed project would begin at CR 531/Red Oak Road and would terminate at CR 417/Hokie Floyd Road. The total length of the project is 2.86 miles. The existing right-of-way is 100 feet.
|
Appling
|
2001
|
4645
|
Duff, Eric Anthony
|
Archaeological Assessment of the Proposed Wetland Mitigation Site for Projects EDS-545(16)(33), Bacon/Ware Counties
|
The proposed wetland mitigation site would include the restoration and enhancement of approximately 44.9 hectares (111 acres) located on a portion of the Echols tract in Pierce County.
|
Bacon
|
1996
|
4649
|
Duff, Eric Anthony, McIntosh, Paul
|
Archaeological Assessment of Project BRSLB-1586(4), Baker County
|
The proposed project would replace the CR 67 bridge spanning Mill Creek in Baker County. The existing bridge is a 120 foot X 22 foot timber and concrete structure, and would be replaced with a 120 foot X 28 foot concrete structure on existing alignment.
|
Baker
|
2001
|
4651
|
Duff, Eric Anthony, McIntosh, Paul
|
Archaeological Reassessment of Project BRZLB-007(2), Baker County
|
The proposed project would consist of replacing the bridge spanning Chickasawhatchee Creek along CR 121 in Baker County. The existing bridge is a 240' X 22' concrete structure, and will be replaced with a 240' X 28' concrete structure on new alignment just north of the existing bridge.
|
Baker
|
2001
|
4652
|
Duff, Eric Anthony, McIntosh, Paul
|
Archaeological Reassessment of Project BRSLB-1630(4), Baker County
|
The original proposed project would consist of replacing the bridge spanning Big Cypress Creek along CR 124 in Baker County. The existing bridge is a 120' X 24' concrete structure, and would be replaced with a 120' X 28' concrete structure.
|
Baker
|
2001
|
4655
|
Duff, Eric Anthony, McIntosh, Paul
|
Archaeological Assessment of Project BRSLB-1630(4), Baker County
|
The proposed project would consist of replacing the bridge spanning Big Cypress Creek along CR 124 in Baker County. The existing bridge is a 120' X 24' concrete structure, and will be replaced with a 120' X 28' concrete structure.
|
Baker
|
2000
|
4662
|
Duff, Eric Anthony, McIntosh, Paul
|
Archaeological Reassessment of Project NH-089-1(26), Baldwin County
|
The original proposed project would widen SR 49 from west of Allen Memorial Drive to east of the bridge over Fishing Creek, for a distance of 2.4 miles. Right-of-way along SR 49 is approximately 100 feet; additional required right-of-way varies from 20 to 50 feet.
|
Baldwin
|
2001
|
4668
|
Duff, Eric Anthony
|
Archaeological Assessment of Project PR-160-1(009), Baldwin County
|
Project PR-160-1(009) allows for grading, drainage, base and surfacing on approximately 0.96 km (0.598 mi.) of roadway on CR 160. Also, the project includes the construction of a two-way left turn lane to CR 160 on SR 29/US 441.
|
Baldwin
|
1994
|