1163 Smith, Greg C., Ashley, Keith H. An Intensive Cultural Resource Assessment of the Jimps Tap Transmission Line Corridor

In December 1993, Environmental Services, Inc., conducted an intensive cultural resource assessment survey of a 1.6 mile long by 75 foot wide corridor in Bulloch County, Georgia. The corridor is the proposed location for Oglethorpe Power Corporation's Jimps Tap 115 kV Transmission Line Project.

Bulloch County, GA 1993
1175 Smith, Greg C., Ashley, Keith H. An Intensive Cultural Resource Assessment Survey of the Proposed Eci Tap 46kv Transmission Line Corridor and Proposed Eci 46/25kv Substation

A cultural resource assessment survey was conducted of the proposed ECI Tap 46 KV Transmission Line and proposed ECI 46/25 KV Substation, Emanuel County, Georgia in April 1994.

Emanuel County, GA 1994
1256 Ashley, Keith H. A Cultural Resource Assessment Survey of the Proposed Harry S. Truman Parkway Extension Corridor, Chatham County, Georgia

A cultural resource assessment survey was conducted of the proposed Harry S. Truman Parkway extension corridor, Chatham County, Georgia in September 1993. The survey corridor was approximately 4.1 miles in length, with an average width of 200 feet.

Chatham County, GA 1994
1333 Ashley, Keith H., Chance, Marsha A. An Archaeological Survey of the US 27 Widening Project LaGrange to the Roopville Bypass

An archaeological assessment survey was conducted by Environmental Services, Inc. (ESI) of a segment of U.S. 27 through Troup, Heard, and Carroll Counties, Georgia, between December 1993 and February 1994.

Carroll County, GA 1995
1422 Ashley, Keith H. An Intensive Cultural Resource Assessment Survey of the Proposed Hopeful-Mt. Olive 46kv Transmission Line

A cultural resource assessment survey was conducted of the proposed Hopeful-Mt. Olive transmission line, Mitchell County, Georgia in September 1995.

Mitchell County, GA 1995
1518 Ashley, Keith H., Rolland, Vicki An Intensive Cultural Resource Assessment Survey of the Proposed Ling Reach 115kv Tap Transmission Line Corridor and Proposed Long Reach 115/25 Kv Substation

A cultural resource assessment survey was conducted of the proposed Long Reach 115 kV Tap Transmission Line Corridor and Long Reach 115/25 kV Substation, Long County, Georgia in July 1996.

Long County, GA 1996
4478 Ashley, Keith H., Bland, Myles An Intensive Cultural Resource Assessment Survey of the Baisden Bluff Parcel, McIntosh County, Georgia

From June 20 to 23, 2006, an intensive cultural resource assessment survey was conducted of a 9acre tract in northern McIntosh County, Georgia. The project tract is the proposed site of the Baisden Bluff development. The present project was undertaken by Bland and Associates, Inc.

McIntosh County, GA 2007
4800 Smith, Greg C., Ashley, Keith H. A Cultural Resource Assessment Survey of the Proposed Genesis Point Marina Bryan County, Georgia

A cultural resource assessment survey was conducted of the proposed Genesis Point Marina, Bryan County, Georgia from December 1994 to January 1995. The Phase I archaeological investigation included a pedestrian survey of the 20 acre tract with systematic shovel testing at 30 meter intervals.

Bryan County, GA 1995
6664 Smith, Greg C., Ashley, Keith H. A Cultural Resource Assessment Survey for the Proposed Expansion of the Lamar County Landfill,Lamar County, Georgia

During June 1997, an intensive cultural resource assessment survey was conducted of an approximately 145 acre tract in Lamar County, Georgia.

Gwinnett County, GA 1993
9270 Smith, Greg C., Chance, Marsha A., Ashley, Keith H. A Cultural Resource Assessment Survey for the Proposed FSL Landfill, Forsyth County, Georgia