1586
|
Blackwelder, Jon R., Pietak, Lynn Marie
|
Phase I Archaeological Survey for Clarkston Parking Lot Upgrades, DeKalb County, GA
|
The proposed project would resurface and renovate an existing paved parking lot located in Clarkston, Georgia. The project area is within existing right-of-way limits and consists of approximately 2.2 acres.
|
DeKalb
|
2008
|
1633
|
Pietak, Lynn Marie, Stanyard, William F.
|
Phase I and II Archaeological Investigations and a Historic Resource Survey for the Haralson Mill Road Improvement Project Between Booth Road and the Walton County Line
|
A Phase I archaeological and historic resource survey of the proposed right-of-way for the Haralson Mill Road Improvement project between Booth Road and the Walton County line was conducted by Garrow & Associates, Inc., in late November 1995.
|
Rockdale
|
1996
|
1779
|
Blackwelder, Jon R., Pietak, Lynn Marie
|
Phase I Survey of Rays Road Sidewald Location, DeKalb County, Georgia
|
Original Project Description for Rays Road: The proposed project limits are from Memorial Drive to Multi-Use Path (approximately 200 feet south of E. Ponce De Leon Avenue) (1.36 miles).
|
DeKalb
|
2008
|
1786
|
Pietak, Lynn Marie
|
SR 10/US 129 at SR 15/US 441 Interchange Safety Improvements, Clarke County, Ga.
|
The proposed project would consist of the installation of an Advanced Truck Warning System (ATWS) along the SR 10 Loop/US 129 westbound off-ramp at SR 15/US 441 in Clark County.
|
Clarke
|
2008
|
1795
|
Pietak, Lynn Marie
|
Second Addend. To Ph. 1 Arch. Survey of Murray Co. Signal Design Upgrades Proj. Areas
|
Second Addendum: Since the CE was approved, there have been additional changes in the amount of required right-of-way and easement. There would be an overall reduction of 3.67 sf of required ROW at Intersection 3 (731.44 sf).
|
Murray
|
2008
|
2006
|
Holland, Jeffrey L., Pietak, Lynn Marie
|
Cultural Resource Survey of the Realignment of Rockdale Circle, Georgia Highway 84, and U.S. Highway 78, Gwinnett County Georgia
|
In October 1995, Garrow & Associates, Inc., under a contract with Columbia Engineering, completed a cultural resource survey for the proposed intersection improvements for the realignment of Rockdale Circle, Georgia Highway 84, and U.S. Highway 78, Gwinnett County, Georgia.
|
Gwinnett
|
2000
|
2075
|
Price, George D., Pietak, Lynn Marie
|
Phase II Testing of 9CN113, 9CN116, and 9CN119 for the Shoal Creek LAS Project, Clayton County, Georgia
|
TRC Garrow Associates, Inc., was contracted by CH2M HILL to conduct Phase II archaeological testing of three sites in Clayton County, Georgia: 9CN113, 9CN116, and 9CN119.
|
Clayton
|
2000
|
2098
|
Pietak, Lynn Marie, Cleveland, M. Todd
|
Phase I Cultural Resource Survey Of The Proposed 9,000-Foot Fifth Runway At Hartsfield Atlanta International Airport, Clayton And Fulton Counties, Georgia
|
From March to June, 2000, Corporate Environmental Risk Management, L.L.C. (GERM), with the support of TRC Garrow Associates, Inc.
|
Clayton
|
2000
|
2126
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey for the Proposed - Center Point 230/115 - KV Transmission Line, Whitfield and Catoosa Counties, Georgia
|
TRC conducted a Phase I archaeological survey for this proposed West Ringgold-Center Point TVA transmission line project from July 10-21, 2000.
|
Catoosa
|
2000
|
2270
|
Holland, Jeffrey L., Pietak, Lynn Marie
|
Phase 1 Archaeological Survey for the Walker Substation, Walker County, Georgia
|
TRC Garrow Associates, Inc. (TRC) conducted a Phase I archaeological survey for the proposed Walker Substation in Walker County, Georgia, southwest of Dalton, on August 28, 2001. The project was undertaken for the Tennessee Valley Authority (TVA).
|
Walker
|
2002
|