1848
|
Wilson, Kristin J., Cleveland, M. Todd
|
Phase I Cultural Resource Survey for the Proposed Cumberland Gas Pipeline Loops A and B and Replacements, Bartow, Cherokee, Forsyth, Gwinnett, Walton, and Whitfield Counties, Georgia
|
From July to October 1998, TRC Garrow conducted an archaeological and historic architectural I cultural resource survey prior to the construction of the proposed Cumberland Gas Le Loops A and B and replacements through Cherokee, Forsyth, Gwinnett, and Walton m Additional work was conducted in Bar
|
Bartow
|
1998
|
2057
|
Cleveland, M. Todd
|
Phase I Cultural Resource Survey of the Proposed St. Marys Historic Waterfront Enhancement Project, St. Marys, Camden County, Georgia
|
TRC Garrow Associates, Inc. (TRC), conducted a Phase I cultural resource survey for the proposed St. Mary's Waterfront Enhancement Project in March 2000.
|
Camden
|
2000
|
2098
|
Pietak, Lynn Marie, Cleveland, M. Todd
|
Phase I Cultural Resource Survey Of The Proposed 9,000-Foot Fifth Runway At Hartsfield Atlanta International Airport, Clayton And Fulton Counties, Georgia
|
From March to June, 2000, Corporate Environmental Risk Management, L.L.C. (GERM), with the support of TRC Garrow Associates, Inc.
|
Clayton
|
2000
|
2935
|
Chancellor, Mark D., Cleveland, M. Todd
|
Addendum to Cultural Resource Survey Report, Klondike Road Widening Project, Rockdale County, Georgia
|
This addendum to the cultural resource survey report entitled Cultural Resource Survey Report, Klondike Road Widening Project, Rockdale County, Georgia (Cleveland et al.
|
Rockdale
|
1997
|
4098
|
Chapman, Ashley A., Cleveland, M. Todd
|
Archaeological Survey and Testing and Historic Architecture Survey and Impact Assessment of the Proposed Western Alignment, Cowan Road Improvement and Extension Project, Cobb County, Georgia
|
An archaeological and historic architecture reconnaissance survey for the proposed Cowan Road Improvement and Extension Project in Acworth, Cobb County, Georgia, was undertaken by Garrow & Associates, Inc., in August 1996.
|
Cobb
|
1997
|
4360
|
Cleveland, M. Todd, Benyshek, Tasha M.
|
Phase I Cultural Resources Survey for Consolidated Car Rental (CONRAC), Fulton and Clayton Counties, Georgia
|
In June 2000, archaeologists and preservation planners with TRC Garrow Associates, Inc., conducted a Phase I cultural resources survey of approximately 88 acres in Fulton and Clayton counties, Georgia.
|
Fulton
|
2000
|
4595
|
Cleveland, M. Todd
|
Phase I Cultural Resource Survey For a Proposed 800 MW Combined-Cycle Power Facility, Chatham County, Georgia
|
TRC was contracted by Competitive Power Ventures Terrapin LLC (CPV Terrapin) to conduct a Phase I cultural resource survey of a 20-acre tract proposed for an 800 MW combined-cycle power generation facility.
|
Chatham
|
2001
|
7159
|
Cleveland, M. Todd
|
Phase I Archaeological Survey and Architectural Survey for the Douglas Waste Service Center, Douglas County, Georgia
|
A Phase I archaeological survey and an architectural survey were conducted for Douglas Waste Service Center, Inc., prior to development of a landfill in Douglas County, Georgia.
|
Murray
|
2005
|
8372
|
Garrow, Patrick H., Cleveland, M. Todd
|
Revised Cultural Resource Management Plan for the Rocky Mountain Project, Floyd County, Georgia
|
The Rocky Mountain cultural resource investigations began in 1972 and have continued to 1997 with preparation of the project cultural resource technical synthesis. The initial cultural resources management plan (CRMP) was completed in 1981 by James J. Shive and amended in 1982.
|
Cobb
|
2010
|
8376
|
Garrow, Patrick H., Cleveland, M. Todd
|
Cultural Resource Studies at the Rocky Mountain Project, Floyd County, Georgia
|
This document synthesizes the results of the various cultural resource studies conducted at the site of the Rocky Mountain Hydroelectric Project in Floyd County, Georgia, between 1972 and 1993.
|
Floyd
|
2013
|