Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of the Hillandale Drive and Fairington Road Project Area, DeKalb County, Georgia
|
The proposed project would consist of the realignment of the intersection of Hillandale Dr. and Fairington Rd. in DeKalb Co. approximately 250 ft north of 1-20 to improve safety and operational efficiency of the intersection.
|
DeKalb
|
2005
|
3063
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey of SR 137 over Whitewater Creek, Taylor County, Georgia
|
Original: The proposed bridge would be constructed on existing alignment and be 160 ft long and 40 ft wide to accommodate two 12-ft wide travel lanes and 8-ft paved shoulders. The bridge would be longer than specified in the initial concept report (120 ft) due to engineering refinements.
|
Taylor
|
2005
|
3073
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey of SR 42 Bridge Replacement over the Echeconnee Creek, Monroe County, Georgia
|
This project is an Addendum to Phase I Archaeological Survey of SR 42 Bridge Replacement Over the Echeconnee Creek, Monroe County, Georgia. Original: The proposed project would replace the exiting bridge with a new 40 ft. wide concrete bridge that is approximately 260 ft. in length.
|
Monroe
|
2004
|
3074
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey for the Widening of the I-20/Alcovy Road Interchange, Newton County, Georgia
|
Addendum to Phase I Archaeological Survey for the Widening of the 1-20/Alcovy Road Interchange, Newton County, Georgia Original Project Description: the proposed project consists of the widening of 1-20 from the CR 660/Alcovy Road interchange eastward to SR 142/Hazelbrand Road and the widening of
|
Newton
|
2004
|
3075
|
Pietak, Lynn Marie
|
Addendum to Archeological Survey of the Proposed Bridge Replacement: SR 122 over Little River, Lowndes and Brooks Counties, Georgia
|
Addendum to Archeological Survey of the Proposed Bridge Replacement: SR 122 over Little River, Lowndes and Brooks Counties, Georgia The total project length has changed from approximately 6,300 feet (1.19 miles) to approximately 8,652 feet (1.64 miles).
|
Brooks
|
2004
|
3076
|
Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey of SR 18/US 27 Bridge Over Kendall Creek, Meriwether County, Georgia
|
The right-of-way has been expanded to include areas previously identified as easement. In addition, these areas on the east side of the road have been expanded 10-20 feet. As in the originally approved plans, there is a sediment basin shown on the north side of SR 18/US 27 at Station 110+00.
|
Meriwether
|
2004
|
3077
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey of SR 85/74 Bridge Replacement Over Pappy's Creek, Meriwether County, Georgia
|
Addendum to Phase I Archaeological Survey of SR 85/74 Bridge Replacement Over Pappy's Creek, Meriwether County, Georgia.
|
Meriwether
|
2004
|
3078
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey of SR 85 Alternate Bridge Replacement Over Pound Creek, Meriwether County, Georgia
|
Addendum to Phase I Archaeological Survey of SR 85 Alternate Bridge Replacement Over Pound Creek, Meriwether County, Georgia. Original Description: The proposed bridge would be constructed on existing alignment and be 120 ft. long and 44 ft. wide, to accommodate two 12 ft.
|
Meriwether
|
2004
|
3081
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey of SR 15 Over Dix Branch, Brantley County, Georgia
|
Addendum to Phase I Archaeological Survey of SR 15 Over Dix Branch, Brantley County, Georgia. Original: The proposed project would replace the existing bridge over Dix Branch with a new bridge approximately 90-feet long by 44-feet wide on the existing alignment.
|
Brantley
|
2004
|
3086
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of Hudson Bridge Road/Eagles Landing Parkway from Jodeco Road Through Intersection with US23/SR42 to Talon Place, Henry County, Georgia
|
Phase I Archaeological Survey of Hudson Bridge Road/Eagles Landing Parkway from Jodeco Road Through Intersection with US23/SR42 to Talon Place, Henry County, Georgia.
|
Henry
|
2004
|