12523 Pietak, Lynn Marie, Brummeler, Charles K. Phase I Archaeology Survey for the Bridge Replacement of SR 81 over Dried Indian Creek, Newton County, Georgia

Georgia Department of Transportation (GDOT) Project P.I. No. 0013751 in Newton County would replace the existing two-lane bridge on State Route (SR) 81 over Dried Indian Creek in Covington, Georgia. The new bridge would be constructed on existing alignment.

Newton 2018
12524 Pietak, Lynn Marie, Brummeler, Charles K. Phase I Archaeological Survey for the Bridge Replacement of State Route 77 Spur over Cedar Creek

The bridge on State Route (SR) 77 Spur over Cedar Creek, Structure ID 147-0013-0, was built in 1957. This bridge consists of three spans of continuous steel girders on concrete caps with concrete columns. The bridge has fatigue prone members (cantilever shoe bearings) in the superstructure.

Hart 2018
12537 Pietak, Lynn Marie Phase I Archaeological Survey for the SR 92 at Bowen Road Intersection Improvements, Fulton County, Georgia.

This proposed project would improve the intersection of State Route (SR) 92 and Bowen Road/Old Mountain Park Road. SR 92 in the project area is an urban principal arterial that connects the City of Roswell with locations westward such as the City of Woodstock and 1-575.

Fulton 2017
12616 Pietak, Lynn Marie Phase I Archaeological Survey for the James Brown Boulevard Streetscape, Richmond County, Georgia

The proposed project will replace existing sidewalks on the east side of James Brown Boulevard (9th Street) in the city of Augusta, Georgia. The James Brown Boulevard project limits begin at Laney Walker Boulevard and end at Twiggs Street.

Richmond 2018
12618 Pietak, Lynn Marie Phase I Archaeological Survey for SR 54 at Shoal Creek, Bridge 077-0020-0, Coweta County, Georgia

The project proposes to replace Bridge # 077-0020-0 on State Road (SR) 54 over Shoal Creek in Coweta County, located 4.4 miles north of Turin, Georgia and about .64 miles south of Immanuel Bible College (Figure 1).

Coweta 2018
12619 Pietak, Lynn Marie Phase I Archaeological Survey of the SR 10 Loop at SR 8/US 29 Bridge Replacement, Clarke County, Georgia

The proposed project would replace the existing SR 15/SR 10 Loop EB and WB at SR 8/US 29 twin bridges with two 12-foot lanes per bridge. Additionally, an 8-foot outside shoulder and a 4-foot inside shoulder would be constructed.

Clarke 2018
12674 Pietak, Lynn Marie Phase I Archaeological Survey for SR 16 at the Flint River, Bridge 255-0012-0, Spalding County, Georgia

The project proposes to replace Bridge # 255-0012-0 on State Road (SR) 16 over the Flint River in Spalding County, located 8 miles west of Griffin, Georgia and about 3.3 miles southeast of Brooks, Georgia (Figure 1).

Spalding 2018
12677 Pietak, Lynn Marie Phase I Archaeological Survey for the SR 136@ Toto Creek Bridge (No. 085-0019-0) Replacement, Dawson County, Georgia

Georgia Department of Transportation (GDOT) P.1. No. 0013990 would replace the existing State Route (SR) 136 bridge over Toto Creek/Lake Lanier located approximately 7.6 miles southeast of the City of Dawsonville. The existing bridge is 272 feet long and has a total deck width of 26.8 feet.

Dawson 2018
12789 Pietak, Lynn Marie Second Addendum to Phase I Archaeological Survey of the Hewatt Road to Britt Drive Connector Road, Gwinnett County, Georgia

This is an intersection improvement project located in Snellville in Gwinnett County, Georgia.

Gwinnett 2018
12816 Pietak, Lynn Marie Phase I Archaeological Survey for the intersection improvements at SR 61/ Cartersville Highway and CR 473/ Dabbs Bridge Road, Paulding County, Georgia

On June 27-28, 2017, EPEI conducted a Phase I archaeological survey for the proposed SR 61/Dabbs Bridge Road intersection improvement (P.I. No. 0013950), in Paulding County, Georgia (Figure 1.1). The project is located in Paulding County approximately 10.4 miles north of Dallas, Georgia.

Paulding 2017