Report Number Author(s) Title Abstract Summary County Year
2771 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project NH-IM-75-2(170), Clayton County

None Present.

Clayton County, GA 2004
2774 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project NH-IM-75-2(174), Clayton County

None Present.

Clayton County, GA 2004
2784 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project BRZLB-71(28), Colquitt County

None Present.

Colquitt County, GA 2004
2820 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project BRST-043-1(59), Jefferson County

None Present.

Jefferson County, GA 2004
2832 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project STP-0005-00(834), Washington County

None Present.

Washington County, GA 2004
2852 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project BR-0000-00(453), Terrell County

None Present.

Terrell County, GA 2004
2966 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project CSNHS-0006-00(688), Fulton County

The proposed project would consist of the widening of approximately 1800 feet of the viaduct located on Interstate 85/SR 403 North to accommodate a 300 foot taper and a 1500 foot auxiliary lane. Total project length is approximately 2500 feet.

Fulton County, GA 2005
2979 McIntosh, Paul Archaeological Assessment of Project CSSTP-0006-00(309), Hall County

The proposed project would consist of the symmetrical widening of SR 13 in order to provide a left turn lane in each direction and an auxiliary right turn lane on the southbound approach.

Hall County, GA 2005
2999 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project CSSTP-0007-00(236), Coweta and Fayette Counties

The proposed project would consist of upgrading traffic signals at various locations along SR 34 and SR 54. All proposed work would be done within existing right-of-way.

Coweta County, GA 2005
3000 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project CSSTP-0007-00(112), Fulton County

The proposed project would consist of upgrading traffic signals at various locations along SR 9 from Bethany Road to SR 120. All proposed work would be done within existing right-of-way.

Fulton County, GA 2005
Displaying 11 - 20 of 259