7380 Pietak, Lynn Marie, Quirk, Phillip W. Phase I Archaeological Survey of the Proposed SR 53 Over Chestatee River (Lake Lanier) Bridge Replacement, Forsyth and Hall Counties, Georgia

During November 2010, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed State Route (SR) 53 over the Chestatee River (Lake Lanier) Bridge Replacement. The project corridor is located in Forsyth and Hall counties, Georgia.

Coffee 2012
7481 Quirk, Phillip W. Phase I Archaeological Survey for Proposed Bridge Replacement at SR 36 over Yellow River, Newton County, Georgia

The Georgia Department of Transportation proposes to replace the structurally deficient bridge carrying State Route (SR) 36 over the Yellow River in southern Newton County; the bridge is located approximately 10 miles south of the City of Covington.

Glynn 2001
7503 Quirk, Phillip W. Phase I Archaeological Survey for Proposed Bridge Replacement at SR 98 over Hickory Level Creek, Banks County, Georgia

The proposed project would consist of replacing a structurally deficient bridge on SR 98 over Hickory Level Creek, located approximately 3.5 miles southwest of Homer, Georgia.

Heard 1996
7508 Quirk, Phillip W. Addendum to Phase I Archaeological Survey of the Proposed Improvements to Jimmy DeLoach Parkway at US 80

The Jimmy DeLoach Parkway Phase II (P.I. 522790) and the Jimmy Deloach Parkway at U.S. 80 Interchange {0007259) project designs are interconnected, and have an approximately 3,750 foot overlap between U.S. 80 and the CSX Railroad crossing.

Effingham 2013
7568 Quirk, Phillip W. Addendum to Phase I Archaeological Survey for the Abbotts Bridge Road Sidewalks, Fulton County, Georgia

The proposed project would construct a raised median along SR 120/Abbotts Bridge Road. The project would also include left turn lanes, curb and gutter, pedestrian crossings, and bike lanes.

Towns 1983
7576 Quirk, Phillip W. Addendum to Phase I Archaeological Survey for the Proposed Widening of Spouts Springs Road, Hall County, Georgia

All addendum areas were accessible for survey. Heavy erosion was notable throughout the project area. Major disturbances observed include sewer line at Retention Pond 6, and a trailer park and associated access road on the west side of Spout Springs Road, south of Thompson Mill Road.

Taylor 1992
7675 Quirk, Phillip W. Phase I Archaeological Survey of the Proposed Shakerag Gravity Sewer Line, Forsyth County, Georgia

During October 2012, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I

Gordon 2002
7709 Quirk, Phillip W. "PHASE I ARCHAEOLOGICAL SURVEY OF THE PROPOSED

From October 15 through October 17, 2013, Edwards-Pitman Environmental Inc. (EPEI) conducted a Phase I archaeological survey of the proposed Lowndes County Surplus Property Transfer, in Lowndes County, Georgia (PM File No. 3026, HP No. 130722-002).

Gordon 1992
7724 Quirk, Phillip W. Addendum to Cultural Resources Survey of the Proposed Widening of SR 4/US 1, Wadley Bypass to State Route 88, Jefferson County, Georgia

On October 29 through November 14, 2013, Edwards-Pitman Environmental, Inc.

Columbia 1995
7858 Quirk, Phillip W., Lewis, Clifford Thomas Phase I Archaeological Survey of Proposed Revive 1-285 Top End, Cobb, DeKalb, and Fulton Counties, Georgia

During June and July 2011, Edwards-Pitman Environmental, Inc.

Rockdale 2013