4312
|
Quirk, Phillip W.
|
Phase I Archaeological Survey of the Proposed I-85 Noise Barriers, Coweta County, Georgia
|
During August 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the Interstate (I) 85 Noise Barriers project.
|
Coweta
|
2008
|
4350
|
Quirk, Phillip W.
|
Phase I Archaeological Survey of the Proposed Old Jesup Road Improvements, Glynn County, Georgia
|
During March 2008, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the Old Jesup Road Improvements project corridor.
|
Glynn
|
2008
|
4472
|
Quirk, Phillip W.
|
Phase I Archaeological Survey of the Proposed Lower Big Creek 20-inch Sanitary Serwer Force Main and Lower Big Creek Lift Station and Sanitary Sewer, Forsyth County, Georgia
|
During August and September 2010, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed corridor and associated acreage for the Lower Big Creek 20-inch Sanitary Sewer Force Main and Lower Big Creek Lift Station and Sanitary Sewer.
|
Forsyth
|
2010
|
4603
|
Quirk, Phillip W.
|
Archaeological Survey of the Proposed State Route 15 Bypass-Eastern Alignment, Washington County, Georgia
|
From July to September 2008, Edwards-Pitman Environmental Inc. (EPEI) conducted an archaeological survey of the proposed State Route (SR) 15 Eastern Alignment project in Washington County, Georgia.
|
Washington
|
2009
|
5319
|
Quirk, Phillip W., Webb, Robert S.
|
Phase 1 Cultural Resources Survey Proposed Hard labor Creek Reservoir, Walton County
|
Background. From July 1998 through May 1999, R.S. Webb & Associates (RSWA) conducted a Phase I cultural resources survey of the proposed Hard Labor Creek Reservoir in Walton County, Georgia.
|
Walton
|
2000
|
5383
|
Pietak, Lynn Marie, Quirk, Phillip W.
|
Phase I Archaeological Survey of Phase II and Phase III Moultrie Streetscape Improvements
|
No existing or eligible National Register resources were located within the project's area of potential environmental effect.
|
Washington
|
2001
|
5503
|
Quirk, Phillip W.
|
Addendum to Phase I Archaeological Survey of the Proposed SR 11 Culvert Replacement, Jackson County, Georgia
|
Georgia Department of Transportation (GDOT) P.I. No. 0011677, in Jackson County, Georgia, is the proposed replacement of an existing reinforced concrete box culvert carrying a tributary to the Mulberry River under SR 11.
|
Decatur
|
1986
|
5539
|
Quirk, Phillip W.
|
Phase I Archaeological Survey of SR 166 Widening and Bowden Bypass, Carroll County, Georgia
|
From September 30 to November 7, 2014, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed State Route (SR) 166 Widening and Bowdon Bypass projects in Carroll County, Georgia (Georgia Department of Transportation [GDOT] P.I. Nos.
|
DeKalb
|
1997
|
5542
|
Quirk, Phillip W., Webb, Robert S.
|
Phase I Cultural Resources Survey of Proposed City of Fairburn Land Application Site, Fulton County
|
A Phase I cultural resources survey of the proposed City of Fairburn Land Application Site in Fulton County, Georgia was conducted to locate and identify cultural resources within the project area and assess resource significance.
|
DeKalb
|
1996
|
5888
|
Quirk, Phillip W.
|
Cultural Resources Survey of the Proposed Waycross-Ware County Airport Expansion
|
A Phase I cultural resources survey of the proposed Waycross-Ware County Airport Expansion Site in Ware County, Georgia, was conducted to locate and identify cultural resources within the project area, and to assess resource significance.
|
Madison
|
1975
|