Back to top

Keith, Scot J.

Report Number Author(s) Title Abstract Summary County Year
9968 Keith, Scot J. Phase I Archaeological Survey of Proposed Replacement of Bridge 031-0011-0 at SR 26 (U.S. 80) over Caney Branch

New South Associates has completed a Phase I Archaeological Survey of Bridge 031-0011-0 at State Road (SR) 26 (U.S. 80) over Caney Branch in Bulloch County, Georgia.

Bulloch 2017
9971 Keith, Scot J. Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 015-5014-0, Norton Road over Tom's Creek, Bartow County, Georgia

The project involves the replacement of Bridge 015-5014-0, which carries Norton Road over Tom's Creek in Bartow County. The project is included In GDOT's Low Impact Bridge Program (LIBP). The existing bridge, constructed in 1950, is structurally deficient and will be replaced.

Bartow 2016
9972 Keith, Scot J. Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 015-5041-0, Littlefield Road over Cedar Creek, Bartow County, Georgia

This project involves the replacement of Bridge 015-5041-0, which carries Littlefield Road over Cedar Creek in Bartow County. The project is Included in GDOT's Low Impact Bridge Program (LIBP). The existing bridge, built in 1939, is structurally deficient and will be replaced.

Bartow 2016
9983 Keith, Scot J. Phase I Archaeological Survey of the I-20 at SR 138/SR 20 Interchange Reconstruction & Widening

This project proposes to reconfigure and widen the existing SR 138 at 1-20 interchange. GDOT has identified two alternatives for the proposed interchange: Alternative A- a diverging diamond interchange; and Alternative 8- a single point urban interchange.

Rockdale 2017
9991 Keith, Scot J. Second Addendum Phase I Archaeological Survey of Proposed Widening of SR 11/US 129 Cleveland Highway from Limestone Road to South of Nopone Road, Gainesville Hall County, Georgia

In compliance with Section 106 of the National Historic Preservation Act of 1966 (36 CFR 800), New South Associates completed a Phase I Archaeological Survey as a sub-consultant to Keck and Wood, Inc., on behalf of the Georgia Department of Transportation (GDOT).

Hall 2017
10018 Keith, Scot J. GDOT ARCHAEOLOGICAL SHORT FORM FOR NEGATIVE FINDINGS Phase I Archaeological Survey, Proposed Replacement of State Road 119 Over Ogeechee River (Bridge 031-0050-0) and Overflow (Bridge 031-0049-0), Bulloch and Effingham Counties, Georgia

The proposed undertaking would replace two existing, non-historic, structurally deficient and functionally obsolete two-lane bridges along SR 119 over the Ogeechee River (GDOT Bridge No. 031 -0050-0) on the Bulloch/Effingham county line and the overflow bridge (GDOT Bridge No.

Bulloch 2017
10019 Keith, Scot J. GDOT ARCHAEOLOGICAL SHORT FORM FOR NEGATIVE FINDINGS Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 119-5006-0, CR 46 (Casey Road) over Unawatti Creek, Franklin County

This project involves the replacement of a structurally insufficient bridge (Bridge 119-5006-0) carrying CR 46 (Casey Road) over Unawatti Creek in Franklin County, Georgia (Attachment 1 ). The existing bridge, built in 1963, is located five miles west of Canon, Georgia.

Franklin 2017
10020 Keith, Scot J. GDOT ARCHAEOLOGICAL SHORT FORM FOR NEGATIVE FINDINGS Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 147-5043-0, Shoal Creek Road over Shoal Creek, Hart County

This project involves the replacement of Bridge 147-5043-0 that carries Shoal Creek Road over Shoal Creek in Hart County, Georgia, located 4.4 miles east of Lavonia, Georgia (Attachment 1 ). The existing bridge, built in 1962, is no longer structurally sufficient and needs to be replaced.

Hart 2017
10032 Keith, Scot J. GDOT Archaeological Short Form for Negative Findings: Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 119-5047-0, Akins Bridge Road over North Fork Broad River, Franklin County

This survey is a part of the GDOT Low Impact Bridge Program (LIBP). The 1 00-foot expanded archaeology survey corridor on typical GDOT projects will be waived in some instances, given that projects in the Program are not intended to extend beyond existing ROW.

Franklin 2017
11000 Keith, Scot J., Brannan, Stefan Phase III Archaeological Data Recovery at Sites 9GO375 and 9GO390 on the Center Point-Moss Lake No. 2 Transmission Line

New South Associates, Inc. (New South) conducted Phase III Archaeological Data Recovery Excavation at two sites (9GO375 and 9GO390) on the proposed route of the Center Point-Moss Lake No. 2 transmission line in Gordon County, Georgia.

Gordon 2018
Displaying 81 - 90 of 115