8821 Keith, Scot J. Phase I Addendum Survey for a Segment of Cleveland Highway/SR 11 at East Fork Little River, Lake Lanier

The proposed project for PI No. 122066 would replace the Cleveland Highway/SR 11 bridge over the East Fork Little River (Lake Lanier) in Hall County, Georgia. The project proposes to replace the bridge and add two travel lanes and eight-foot shoulders to the existing roadway.

Columbia 2006
8825 Keith, Scot J. Phase I Archaeological Survey of Nine Intersections in Forsyth County, Georgia

The project will upgrade equipment, accommodate pedestrians, and update pedestrian facilities at nine intersections in order to meet current American with Disabilities Act (ADA) standards.

DeKalb 2015
8868 Keith, Scot J. Phase I Cultural Resource Survey of SR 122 lmprovments, CR 39 to CR 68, Ware County, Georgia

The Georgia Department of Transportation proposes to realign SR 122/Carswell Avenue to soften the sharp reverse curves that currently exist between Corbitt Road and Pine Valley Road/CR 68 to reduce car crash frequency and severity. The current plans offer three possible alternatives.

Towns 2002
8909 Keith, Scot J. Phase I Archaeological Survey of the Kingsley Charter Elementary School, DeKalb County Safe Routes to School Program

Kingsley Charter School is located in a residential neighborhood in DeKalb County.

Chatham 2003
9253 Keith, Scot J. An Archaeological Survey of the Columbus Riverwalk - Bibb Mill to City Mills

Report Missing.

Muscogee 2001
9319 Keith, Scot J. Intensive Archaeological Resource Survey of Signal Upgrades at Four Intersections in Fannin, Gilmer, and Pickens Counties, Georgia

The proposed project will upgrade four existing traffic signal installations in Fannin, Gilmer, and Pickens Counties, Georgia (P.I. No. 001311 0). These intersections include:

• Area 1: Intersection of State Route (SR) 515 at Ballewtown Road in Fannin County;

Fannin 2016
9507 Keith, Scot J. Phase I Archaeological Survey, Off-System Safety Improvements at Three Locations, DeKalb County, GA

For this safety action project, the Georgia Department of Transportation (GDOT) proposes safety improvements along three roads in DeKalb County, totaling about 7.97 miles. All of the work for this project will take place within the existing right-of-way (ROW).

DeKalb 2016
9509 Keith, Scot J. Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 145-0052-0 Old West Point Road (CR 29) over Chattahoochee River Tributary, Harris County, Georgia

The project involves the replacement of the bridge carrying Old West Point Road (CR 29) over an unnamed tributary of the Chattahoochee River under GDOT’s Low Impact Bridge Program (LIBP) in Harris County (Attachment 1). The existing bridge is structurally deficient and will be replaced.

Harris 2016
9510 Keith, Scot J. Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 145-5003-0, Bethany Church Road (CR 2) over Turkey Creek Tributary , Harris County, Georgia

The project involves the replacement of the bridge carrying Bethany Church Road (CR 2) over a tributary of Turkey Creek in Harris County (Attachment 1). The project is included in GDOT’s Low Impact Bridge Program (LIBP). The existing bridge is structurally deficient and will be replaced.

Harris 2016
9511 Keith, Scot J. Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 145-5037-0, 0 Street (CR 248) over Palmetto Creek, Harris County, Georgia

The project involves the replacement of the bridge carrying 0 Street (CR 248) over Palmetto Creek under GDOT’s Low Impact Bridge Program (LIBP) in Harris County (Attachment 1). The existing bridge is structurally deficient and will be replaced.