Back to top

Keith, Scot J.

Report Number Author(s) Title Abstract Summary County Year
7030 Keith, Scot J., Davis, Valerie Phase I Archaeological Survey for the Bridge Replacement on SR 32 over Bear Creek Coffee County, Georgia

New South Associates completed the archaeological survey portion of the Cultural Resource Survey for the bridge replacement on SR 32 over Bear Creek under contract with CDM Smith.

Twiggs County, GA 1976
7033 Keith, Scot J. Phase II Archaeological Testing of 9BW103

The Halvorsen Development Corporation (Halvorsen) has applied to the United States Army Corps of Engineers (USACE) for a permit under Section 404 of the Clean Water Act in order to proceed with its proposed development of the Chateau Village Shoppes in Barrow County, Georgia.

McIntosh County, GA 1982
7059 Keith, Scot J., Davis, Valerie Phase I Archaeological Survey for the Bridge Replacement on SR 64 over 17-Mile River

New South Associates completed the archaeological survey portion of the Cultural Resource Survey for the bridge replacement on SR 64 over 17-Mile River in response to request by CDM Smith.

Glynn County, GA 1975
7061 Keith, Scot J., Davis, Valerie Phase I Archaeological Survey for the Bridge Replacement on SR 158 over Satilla River

New South Associates completed the archaeological survey portion of the Cultural Resource Survey for the bridge replacement on SR 158 over the Satilla River in response to a request by CDM Smith.

Glynn County, GA 1967
7334 Keith, Scot J., Wood, W. Dean Archaeological Data Recovery at 9ME357 Muscogee technology Park, Columbus Georgia

In September of 2001, Southern Research conducted data recovery at Site 9Me357 for the City of Columbus, Georgia. Located on the Midland 7.5 minute USGS topographic quadrangle, the site is situated on a ridge nose which terminates above the floodplain of Bull Creek (Figure I).

Worth County, GA 2011
7366 Keith, Scot J., Wood, W. Dean Archaeological Data Recovery at 9ME315 Muscogee Technology Park Columbus, Georgia

In September of200 I, Southern Research conducted data recovery excavations at Site 9Me315 for the City of Columbus, Georgia.

Jasper County, GA 2012
7385 Botwick, Brad, Keith, Scot J. Phase I Archaeological Survey of an Additional Parcel of the Gateway Tract

In January of 2011, New South Associates, Inc. conducted a Phase I Archaeological Survey of a parcel of land appended to the eastern portion of the existing Gateway Tract, a 125-acre parcel that was surveyed by New South in 2009.

Fulton County, GA 2001
7479 Coco, Julie, Keith, Scot J. Addendum to Phase I and II Investigations Along State Route 255: Archaeological and Historical Investigations for the Proposed Elks Club Golf Course Cost-to-Cure Alterations

The Georgia Department of Transportation (GDOT) plans to replace the bridges on State Road (SR) 225 over New Town Creek and the Coosawattee River, as well as realign the road from the New Echota Historic Site entrance to just east of County Road 125/McDaniel Road in Gordon County.

Dougherty County, GA 1996
7551 Keith, Scot J. Phase I Archaeological Survey for the I-575 Encroachment Permit Project

New South Associates completed a Phase I Archaeological Survey at the request of Croy Engineering as part of an encroachment permit needed for development of the future Outlet Shoppes of Atlanta.

Tattnall County, GA 1997
7555 Keith, Scot J. Phase I Archaeological Survey of the Grayson Elementary School, Gwinnett County Safe Routes to School Program

Grayson Elementary School is located in a residential section of the City of Grayson in Gwinnett County.

Gwinnett County, GA 1984
Displaying 21 - 30 of 115