3547
|
Patch, Shawn M.
|
The Search for Camp Lawton: Ground Penetrating Radar (GPR) Investigations at Magnolia Springs State Park, Jenkins County, Georgia
|
On October 25-26 2005, staff archaeologists from the Georgia Department of Transportation (GDOT) conducted a series of ground penetrating radar (GPR) assessments of selected areas within Magnolia Springs State Park (MSSP), in Jenkins County, Georgia.
|
Jenkins
|
2006
|
3548
|
Patch, Shawn M.
|
Identification of Unmarked Burials using Ground Penetrating Radar in the Madison City Cemetery, Morgan County, Georgia
|
On February 21, 2006, staff archaeologists from the Georgia Department of Transportation (GDOT) conducted a ground penetrating radar (GPR) assessment of a small portion of the Madison City Cemetery, in Morgan County, Georgia (Figure 1).
|
Morgan
|
2006
|
3553
|
Patch, Shawn M.
|
Archaeological Reassessment of GeorgiaDOT Project STP-BRS-0692(25), Haralson County
|
This is an Archaeological Reassessment of GDOT Project STP-BRS-0692(25) in Haralson County by the GDOT. The proposed project would replace the functionally obsolete and structurally deficient bridge on SR 100 over Walker Creek approximately 3 miles south of Tallapoosa, Georgia.
|
Haralson
|
2006
|
3559
|
Patch, Shawn M.
|
Archaeological Assessment of GDOT Project STP-0006-00(017), Baldwin County
|
This is an Archaeological Assessment of GDOT Project STP-0006-00(017), Baldwin County. The proposed project would improve the intersection of SR 22/Montgomery Street and CR 477/North Jefferson Street in the City of Milledgeville, Baldwin County, Georgia.
|
Baldwin
|
2006
|
3561
|
Patch, Shawn M.
|
Archaeological Reassessment of GDOT Project BR-0000-00(683), Gordon County
|
This is an Archaeological Reassessment of GDOT Project BR-0000-00(683) in Gordon County. The proposed project would replace the existing structurally deficient bridge on CR 143/County Line Road over Polecat Creek in Gordon County.
|
Gordon
|
2006
|
3564
|
Patch, Shawn M.
|
Archaeological Assessment of GDOT Project STP-0005-00 (831), Laurens County
|
This is an Archaeological Assessment of GDOT Project STP-0005-00(831) in Laurens County. The proposed project would improve the intersection of SR 29 and SR 199 in the City of East Dublin, Laurens County.
|
Laurens
|
2006
|
3565
|
Patch, Shawn M.
|
Archaeological Assessment of GDOT Project BRZLB-F003-00(007), Atkinson County
|
This is an Archaeological Assessment of GDOT Project BRZLB-F003-00(007) in Atkinson County. The proposed project would replace the existing bridge on CR 42/Antioch Church Road over Pudding Creek, approximately 4 miles northwest of Pearson, in Atkinson County.
|
Atkinson
|
2006
|
3566
|
Patch, Shawn M.
|
Archaeological Reassessment of GDOT Project STP-2928(1), Troup County
|
This is an Archaeological Reassessment of GDOT Project STP-2928(l) in Troup County. The proposed project would widen and reconstruct SR 14/US 29 from 0.16 mile west of West Meadow Drive to SR 14 Spur in Troup County. SR 14/US 29 is a rural two lane road with 4 foot grassed shoulders.
|
Troup
|
2006
|
4405
|
Espenshade, Christopher T., Patch, Shawn M.
|
A Middle Woodland Household on the Etowah River: Archaeological Investigations of the Hardin Bridge Site 9BR34
|
Phase III archaeological investigations were undertaken at the Hardin Bridge site in Bartow County, Georgia. New South Associates conducted the work for Greenhorne & O' Mara and the Georgia Department of Transportation (GDOT).
|
Bartow
|
2008
|
4611
|
Patch, Shawn M.
|
Archaeological Reassessment of Project GIP-341(39), Appling and Wayne Counties
|
The proposed project would widen and reconstruct US 341/SR 27 from the eastern city limits of Surrency to the western city limits of Odum in Appling and Wayne Counties. Existing right-of-way along US 341/SR 27 is approximately 100 feet.
|
Appling
|
2002
|