11260 Bowen, Rowe Archaeological Assessment of Project IR-75-2(140), (142), (144), & (145), Monroe-Lamar-Butts-Henry-Spalding Counties

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project (listed above in subject) has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP).

Monroe 1984
11491 Bowen, Rowe Archaeological Assessment of Project FR-005-3(18), Bibb County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project FR-005-3(18), Bibb County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP).

Bibb 1992
11980 Fleming, Sherry, Bowen, Rowe Archaeological Assessment of IM-20-2(177), Rockdale County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, IM-20-2(177), Rockdale County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP).

Rockdale 1998
12040 D'Avino, Gail A., Bowen, Rowe Project MASTP-00MS(245) Douglas County, Determination of No Undertaking

Project MASTP-00MS(245), Douglas County: Determination of No Undertaking; the subject project would consist of the leveling and resurfacing of SR 92. The proposed project would begin at the Fulton County line and would end at the intersection of Flowers Drive.

Douglas 1997
12074 D'Avino, Gail A., Bowen, Rowe Project OSAP-98-7(2) Fulton County, Determination of No Undertaking

Project OSAP-98-7(2), Fulton County: Determination of No Undertaking; the subject project would consist of the installation of a 2.82 m (9.25ft) high pedestrian fence above the sidewalk on the Boulder Park Road bridge over I-285.

Fulton 1997
12666 Bowen, Rowe Archaeological Assessment of Project F-003-1(9), Cobb/Fulton Counties

Project F-003-1(9) is the proposed widening and improvement of Bankhead Highway (U.S. 278/S.R. 8) beginning at the 1-285 interchange and proceeding west along Bankhead Highway to and including improvements and widening of the bridge over the Chattahoochee River (see Figure 1).

Cobb 1984
12683 Bowen, Rowe Archaeological Assessment of Project BRF-090-2(8), Johnson County

Big Cedar creek-40’ x 250’ concrete bridge. A temporary detour with easement in required in the downstream side. Little Cedar creek- double 10’ x 8’ concrete bridge culvert. A temporary detour easement is required on the down stream side.

Johnson 1986
12693 Bowen, Rowe Archaeological Assessment of Project I-20-2(6), Columbia County

This is the investigation of a mound in a proposed weight station area near Uchee Creek on I-20 in Columbia County. The project was originally supposed to miss the mound, but has been revised to take it. The mound Is 10-15 feet high and rises sharply above the surrounding land.

Columbia 1981
12722 Bowen, Rowe Archaeological Assessment of Project BRS-1873(3), Evans County

This is the construction of a detour bridge over Bull Creek on SR 129. The existing bridge will be replaced in place and the detour is about 1200 feet long and the center line is located 50’ east of the existing area.

Evans 1985
12918 Fleming, Sherry, Bowen, Rowe Archaeological Assessment of BRZLB-3268(1), Bibb County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, BRZLB-3268(1), Bibb County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP).

Bibb 1998