Back to top

Bloom, Jonathan A.

Report Number Author(s) Title Abstract Summary County Year
817 Bloom, Jonathan A. Cultural Resources Survey of the Proposed Ogelthorpe Power Corporation Dublin Chip Mill Transmission Line Corridor and Substation Site, Laurens County, Georgia

This report documents the results of the cultural resources survey of the proposed East Dublin 46/12kV Substation, Laurens County, Georgia, for Oglethorpe Power Corporation. The project area was severely disturbed from recent bulldozing activities associated with the clearing an adjacent lot.

Laurens County, GA 1988
821 Bloom, Jonathan A. Cultural Resources Survey of Oglethorpe Power Corporation's Proposed Louisiana-Pacific 115 Kv Substation and Transmission Line, Jackson County, Georgia

This report documents the results of the cultural resources survey of the proposed Louisiana-Pacific 115 kV Substation and Transmission Line, Jackson County, Georgia, for Oglethorpe Power Corporation. No significant cultural resources were encountered within the project area.

Jackson County, GA 1989
828 Bloom, Jonathan A., Garrow, Patrick H. Cultural Resources Survey of Two Proposed Lake and Borrow Areas for the Georgia Northern Industrial Park, Bartow County, Georgia

This report documents the results of the cultural resources survey of a proposed 30 acre lake and associated borrow areas, and a six acre lake, for the Georgia North Industrial Park, Bartow County, Georgia, for Bartow Engineering & Development Consultants.

Bartow County, GA 1989
834 Bloom, Jonathan A. Cultural Resources Survey of the Proposed Oglethorpe Power Corporation South Griffin-double Cabins 115 Kv Transmission Line, Spalding County, Georgia

This report documents the results of the cultural resources survey of the proposed South Griffin-Double Cabins 115 kV Transmission Line, Spalding County, Georgia, for Oglethorpe Power Corporation. One isolated find was recorded.

Spalding County, GA 1988
838 Weaver, Guy G., Bloom, Jonathan A. Addendum To: Archaeological Survey of the Proposed Northrop Substation and Transmission Line, Peach and Houston Counties, Georgia

This report details an archaeological survey of the proposed Northrop (Line B) substation and transmission line located in Peach and Houston counties, Georgia.

Houston County, GA 1987
863 Bloom, Jonathan A. Cultural Resources Survey of Oglethorpe Power Corp. Proposed Cairo Chip Mill Substation Site & 115 Kv Transmission Line Corridor

This report documents the results of the cultural resources survey of the proposed Cairo Chip Mill Substation and 115 kV Transmission Line, Grady County, Georgia, for Oglethorpe Power Corporation. Three historic sites and one isolated find were discovered.

Grady County, GA 1989
873 Bloom, Jonathan A. Cultural Resources Survey of Oglethorpe Power Corporation's Proposed Webb Road 115/25 Kv Substation, Troup County, Georgia

This report documents the results of the cultural resources survey of the proposed Webb Road 115/25 kV Substation, Troup County, Georgia, for Oglethorpe Power Corporation. No significant cultural resources were encountered in the project area.

Troup County, GA 1989
900 Bloom, Jonathan A. Cultural Resources Survey of the Proposed Oglethorpe Power Corporation Upper Pike 46/12 Kv Substation, Pike County, Georgia

This report documents the results of the cultural resources survey of the proposed Upper Pike 46/12kV Substation, Pike County, Georgia, for Oglethorpe Power Corporation. No cultural resources were encountered in the project area.

Pike County, GA 1988
902 Bloom, Jonathan A., Green, Lane Archaeological Testing of Sites 1, 2, 4, 5 in the Proposed Ronald Reagan Expressway Corridor

Survey Sites 1, 2, 4, and 5 in the proposed Ronald Reagan Expressway Corridor were tested. Archaeological testing procedures varied in accordance with two general site types: historic sites with standing structures (Sites 1 and 2); and subsurface prehistoric sites (Sites 4 and 5).

Gwinnett County, GA 1988
913 Bloom, Jonathan A. Cultural Resources Survey of the Proposed Oglethorpe Power Corp. Mt. Carmel 230/25kv Substation

This report documents the results of the cultural resources survey of the proposed Mt. Carmel 230/25kV Substation site, Douglas County, Georgia, for Oglethorpe Power Corporation. No cultural resources meriting further investigation were identified in the project area.

Douglas County, GA 1988
Displaying 1 - 10 of 60