Back to top

Joseph, Joseph W.

Report Number Author(s) Title Abstract Summary County Year
3486 Joseph, Joseph W. The Phase 1 Archaeological Survey of the SR 120 Realignment in Duluth, Gwinnett County, Georgia

The project consisted of a Phase I intensive archaeological survey of approximately 600 feet of new alignment along SR/120, between Buford Highway and Hill Street, Duluth, Georgia. The project includes the installation of a traffic light at the proposed intersection of SR 120 and Main Street.

Gwinnett 2006
3487 Joseph, Joseph W. The Phase 1 Archaeological Survey of the Davenport Road Extension in Duluth, Gwinnett County, Georgia

The project consisted of a Phase I intensive archaeological survey of approximately 1,200 feet of new alignment extending Davenport Road from the southern end of Hill Street to Buford Highway.

Gwinnett 2006
3503 Mauldin, Heather, Joseph, Joseph W. Phase I Archaeological Survey of the Macon Terminal Station, Bibb County, Georgia

In September and October of 2005 New South Associates conducted an archaeological survey as part of a cultural resource assessment (CRA) for the proposed relocation of the executive office and general operating functions of the Macon/Bibb County Transit Authority (MTA) to the Macon Terminal Stati

Bibb 2006
3506 Joseph, Joseph W., Tankersley, Matthew Phase 1 Archaeological Survey of Buford Highway /SR 20 Corridor Forsyth and Gwinnett Counties, Georgia

New South Associates conducted a Phase I archaeological survey of two road corridors along Buford Highway/SR 20 between Peachtree Industrial Boulevard and Samples Road Gwinnett and Forsyth Counties, Georgia.

Forsyth 2006
3511 Joseph, Joseph W. Phase I Archaeological Survey of Georgia State University Improvements Project, Piedmont Avenue, Atlanta, Fulton County, Georgia

This is a GDOT report short form for a phase I intensive archaeological survey of approximately 3,400 linear feet of Piedmont Avenue, between the Georgia State University MARTA station (south of Decatur Street) and John Wesley Dobbs Avenue.

Fulton 2006
3512 Joseph, Joseph W. Phase 1 Archaeological Survey of Georgia State University Improvements Project, Decatur Street Atlanta, Fulton County, Georgia

This is a GDOT archaeological report short form for negative findings for a pedestrian survey transects were walked along on both sides of the corridor and shovel test locations were investigated at a 100-feet (30-meter) interval. These transect were oriented parallel to Decatur Street.

Fulton 2006
3536 Joseph, Joseph W. Phase I Archaeological Survey of the James Burgess Road Sidewalk Project, Forsyth County, Georgia

Phase I intensive archaeological survey of approximately 2.67 miles of the north side of James Burgess Road, between Old Atlanta Road and River Mist Drive. A proposed sidewalk will be constructed within the existing right-of-way along the north side of James Burgess Road.

Forsyth 2006
3541 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey of the Proposed HOV Lanes along Interstate 20 from SR5 to SR6 and Associated Interchanges, Douglas County, Georgia

New South Associates conducted a Phase I archaeological survey of the proposed I-20 HOV lanes in June and October of 2005.

Douglas 2006
3568 Joseph, Joseph W., Tankersley, Matthew The Spier house: Architectural History and Archaeology of an Antebellum House Site

This report presents the results of an architectural historical documentation and archaeological data recovery of Site 9FU411, the Spier House, conducted by New South Associates, Inc. Fieldwork for this project took place in May, September, and October of 2004.

Fulton 2006
3602 Joseph, Joseph W. Phase I Archaeological Survey of the Proposed Interchange I-95/CR 138 Horse Stamp Road; Camden County, Georgia

Between October 25 and 27, 2005, New South Associates conducted a Phase I Archaeological Survey of the proposed interchange at I-95 and CR 138 (Horse Stamp Church Road) in Camden County, Georgia.

Camden 2006
Displaying 151 - 160 of 297