Back to top

Garrow, Patrick H.

Report Number Sort descending Author(s) Title Abstract Summary County Year
903 Garrow, Patrick H. Ronald Reagan Parkway Cultural Resources Assessment

A cultural resources survey of the proposed Gwinnett Cross County Connector was conducted by Garrow & Associates, Inc. from October 26 through October 30, 1987.

Gwinnett 1988
907 Garrow, Patrick H. Marta North Line Aa/deis Environmental Support Studies Archaeological Resources Contract Ex3-3

This report documents the results of a literature and records search conducted on the proposed MARTA North Line.

DeKalb 1988
984 Garrow, Patrick H. Archaeological Survey of the Proposed Jonesville 46/12kv Substation Site, Carroll County, Georgia

This report documents an archaeological survey that was conducted on a 4.6 acre tract in Carroll County, Georgia proposed for construction of a 46/12 kV substation by Oglethorpe Power Corporation.

Carroll 1990
1018 Garrow, Patrick H., Britt, Tad Phase 1 Cultural Resource Survey for the Proposed Chase Road Substation, Habersham County, Georgia

This report documents the results of a cultural resources survey of the proposed Chase Road Substation, located in Habersham County, Georgia. This survey was conducted by Garrow & Associates, Inc., Atlanta for Oglethorpe Power Corporation, Tucker, Georgia.

Habersham 1992
1121 McNutt, Charles H., Garrow, Patrick H. Archaeological Survey of the Proposed Highway 371 115/12kv Substation Site, Forsyth County, Georgia

This report documents the results of an archaeological survey of a five acre tract proposed for construction of a 115/12kV substation by Oglethorpe Power Corporation in Forsyth County, Georgia.

Forsyth 1990
1157 Garrow, Patrick H., Stanyard, William F. A Phase I Archaeological Survey of the Proposed Rocky Mountain to Pinson 500kv Transmission Line Corridor Floyd County, Georgia

This report details the results of a Phase I archaeological survey of the proposed Rocky Mountain to Pinson 500 kV transmission line corridor. A total of 18 archaeological sites and nine isolated finds were recorded.

Floyd 1993
1161 Garrow, Patrick H., Stanyard, William F. Phase II Testing at Seven Sites along the Proposed Rocky Mountain to Pinson 500kv Transmission Line Corridor Floyd County, Georgia

This report details the results of Phase II testing at one historical and six prehistoric archaeological sites situated in the proposed Rocky Mountain to Pinson 500kV transmission line corridor. The sites are designated 9FL272, 9FL273, 9FL274, 9FL276, 9FL283, 9FL285, and 9FL286.

Floyd 1993
1251 Garrow, Patrick H. Archaeological Investigation of the Proposed Site of the Lumpkin County Reservoir, Lumpkin County, Georgia

The literature and records search undertaken on this project indicated that no archaeological sites were known to exist on the study property prior to the field survey.

Lumpkin 1990
1277 Gunn, Joel D., Garrow, Patrick H. Cultural Resources Investigation of the Etng/sonat Interconnect Project, Hamilton County, Tenn., and Catoosa County, Georgia

This report documents the literature and records search and intensive archaeological survey conducted on the proposed ETNG/SONAT Interconnect Project for East Tennessee Natural Gas Company (ETNG).

Catoosa 1994
1311 Garrow, Patrick H. Preservation Plan for Site 9Ro84 Within the Georgia International Horse Park Rockdale County, Georgia

Site 9R084 is a large, deeply buried prehistoric archaeological site that also contains a minor historic component. This site was one of 14 archaeological sites identified during the Phase I investigation, and the only substantive site that was identified within the Yellow River floodplain.

Rockdale 1995
Displaying 61 - 70 of 142