Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
10703 Erickson, Luke W. Archaeological Assessment of the Rabun County Resurfacing Project

Archeological Assessment of the Rabun County Resurfacing Project.

Rabun County, GA 2003
10704 Erickson, Luke W. Archaeological Assessment of a Colquitt County Road Safety Project

Archeological Assessment of a Colquitt County Road Safety Project. This project proposes to install new road striping and warning signs at seven locations throughout Colquitt County. All work will take place within the existing right-of-way with no new right-of-way required.

Colquitt County, GA 2005
10705 Erickson, Luke W. Archaeological Assessement of a Harris County Resurfacing Project

Archeological Assessment of a Harris County Resurfacing Project. This project consists of milling, leveling, resurfacing, and shoulder building on SR 116 beginning at M.P. 0.00 and ending at M.P. 9.02.

Harris County, GA 2005
10706 Erickson, Luke W. Archaeological Assessment of a Columbia County Resurfacing Project

This project consists of the resurfacing, milling, leveling, patching, and shoulder building of SR 150 beginning at SR 104/4 7 and ending at the South Carolina County Line. All work will take place within the existing right-of-way with no new right-of-way required.

Columbia County, GA 2006
10707 Erickson, Luke W. Archaeological Assessment of a DeKalb County Resurfacing Project

This proposed project consists of the milling and resurfacing of SR 260, beginning at its intersection with SR 155 (M.P. 3.52) and ending at its intersection with SR 12 (M. P. 7.62). All work will take place within the existing right-of-way with no new right-of-way required.

DeKalb County, GA 2005
10708 Erickson, Luke W. Archaeological Assessment of a Grady County Resurfacing Project

This proposed project is the milling, leveling and resurfacing of SR 111 beginning at M.P. 22.40 and ending at the Grady/Thomas County Line. All work will take place within the existing right-of-way with no new right-of-way required. Total project length is approximately 9.044 miles.

Grady County, GA 2005
10709 Erickson, Luke W. Archaeological Survey of Project CSSTP-M003-00(422), Dougherty County

"In compliance with Section I 06 of the National Historic Preservation Act of 1966 and amendments thereto, project CSSTP-M003-00(422), Dougherty County, has been surveyed with respect to archeological resources, especially those on or eligible for inclusion in the National Register of Historic Pl

Dougherty County, GA 2006
10710 Erickson, Luke W. Archaeological Assessment of a Chattooga County Resurfacing Project

Archeological Assessment of a Chattooga County Resurfacing Project. This proposed project consists of the leveling, resurfacing, shoulder rehabilitation, and striping of SR 48 beginning at the Alabama State Line and ending at M.P. 11.80.

Chattooga County, GA 2006
10711 Erickson, Luke W. Archaeological Assessment of a Muscogee/Chattahoochee County Resurfacing Project

This project consists of the resurfacing, milling, patching, leveling, and shoulder building on SR 520, beginning in Muscogee County at the bridge over 1-185 (M.P. 5.84) and ending at the asphalt joint at its intersection with CR 9/Renfroe Road in Chattahoochee County.

Chattahoochee County, GA 2005
10712 Erickson, Luke W. Archaeological Assessment of a Wilkes County Resurfacing Project

This proposed project would mill, resurface, level, patch, and build shoulders on SR 44, beginning at the Wilkinson County Line and ending at its intersection with SR 10. All work will take place within the existing right-of-way with no new right-of-way required.

Wilkes County, GA 2005