Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
10733 Erickson, Luke W. Archaeological Assessment of a Coffee County Resurfacing Project

Archeological Assessment of a Coffee County Resurfacing Project. This proposed project consists of the · resurfacing, restriping, and shoulder regrassing of SR 107 /US 319 beginning at the Ben Hill/Coffee County Line and ending west of its intersection with SR 31/US 319 (M.P. 1.59).

Coffee County, GA 2005
10734 Erickson, Luke W. Archaeological Assessment of a Habersham County Resurfacing Project

Archeological Assessment of a Habersham County Resurfacing Project. This proposed project consists of the milling, resurfacing, restriping, and loop detector replacement on SR 197 beginning at its intersection with SR 385 and ending at its intersection with SR 17/SR 197.

Habersham County, GA 2005
10735 Erickson, Luke W. Archaeological Assessment of a Atkinson County Resurfacing Project

Archeological Assessment of an Atkinson County Resurfacing Project. This proposed project consists of the leveling and resurfacing of SR 64 from the Lanier County Line to SR 31. All work will take place within the existing right-of-way with no new right-of-way required.

Atkinson County, GA 2005
10736 Erickson, Luke W. CSSTP-M003-00(360), P.I. M003360 Clayton County Resurfacing Project

This proposed project consists of the leveling, resurfacing, and shoulder building of SR 3 Connector beginning at the entrance to the Arrowhead Shopping Center and ending at the I-75 entrance and exit ramps.

Clayton County, GA 2005
10737 Erickson, Luke W. Archaeological Assessment of a Fulton County Resurfacing Project

Archeological Assessment of a Fulton County Resurfacing Project. This project consists of leveling and resurfacing of SR 9 beginning at 14th Street and ending at Peachtree Street. All work will take place within the existing right-of-way with no new right-of-way required.

Fulton County, GA 2005
10738 Erickson, Luke W. Archaeological Assessment of a Hancock County Resurfacing Project

This project consists of the milling, leveling, resurfacing, and shoulder building of SR 77 beginning at its intersection with SR 16 and ending at its intersection with SR 15. All work will take place within the existing right-of-way, with no new right-of-way required.

Hancock County, GA 2005
10738 Erickson, Luke W. Archaeological Assessment of a Hancock County Resurfacing Project

This project consists of the milling, leveling, resurfacing, and shoulder building of SR 77 beginning at its intersection with SR 16 and ending at its intersection with SR 15. All work will take place within the existing right-of-way, with no new right-of-way required.

Hancock County, GA 2005
10738 Erickson, Luke W. Archaeological Assessment of a Hancock County Resurfacing Project

This project proposes to mill and resurface SR 32 beginning at SR 300 and ending at the Turner/Worth County Line. All work will take place within the existing right-of-way, with no new right-of-way required. Total project length is approximately 12.663 miles.

Hancock County, GA 2005
10739 Erickson, Luke W. Archaeological Assessment of a Worth County Resurfacing Project

This project proposes to mill and resurface SR 32 beginning at SR 300 and ending at the Turner/Worth County Line. All work will take place within the existing right-of-way, with no new right-of-way required. Total project length is approximately 12.663 miles.

Worth County, GA 2005
10740 Erickson, Luke W. Archaeological Assessment of a Douglas County Resurfacing Project

This project proposes to mill and resurface SR 5 beginning at the Douglas/Carroll County Line and ending at I-20. All work will take place within the existing right-of-way, with no new right-of-way required. Total project length is approximately 13.14 miles.

Douglas County, GA 2005