Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
10741 Erickson, Luke W. CSSTP-M003-00(359), P.I. M003359 Clayton County Resurfacing Project

This proposed project consists of the leveling, resurfacing, and 2' shoulder paving and 4' shoulder building of SR 85 beginning at its intersection with SR 331 and ending 120' south of the bridge from the I-75 ramp.

Clayton County, GA 2005
10742 McIntosh, Paul Archaeological Assessment of Project STP-M000-00(663), Early County

Archaeological Assessment of Project STP-M000-00(663), Early County, Milling, grooving and resurfacing 2 foot left and right along State Route 62 Bypass, from the intersection of State Route 62 on the west side of Blakely northward and eastward to the State Route 62 intersection on the east side

Early County, GA 2000
10743 Erickson, Luke W. Archaeological Assessment of the Forsyth County Resurfacing Project

Archeological Assessment of the Forsyth County Resurfacing Project. This proposed project on SR 369 is 7.4 miles in length beginning 600' west of Holtzclaw Rd. (MP 12.3) and ending at the bridge over Lake Lanier (MP 19.8). The project consists of patching, leveling, and resurfacing.

Forsyth County, GA 2003
10744 Erickson, Luke W. Archaeological Assessment of the Forsyth County Resurfacing Project

Archeological Assessment of the Forsyth County Resurfacing Project.

Forsyth County, GA 2003
10745 Fleming, Sherry Archaeological Assessment of Project OSAP-98-4(3), Lowndes County

"In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, and the Georgia Environmental Policy Act of 1991, project OSAP-98-4(3), Lowndes County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusio

Lowndes County, GA 1998
10746 Lotti, Teresa Ann Archaeological Assessment of Project STP-M001-00(772), Decatur and Baker Counties

Archaeological Assessment of Project STP-MOOl-00(772), Decatur and Baker Counties, paving two feet of existing shoulder on each side of SR 253, as well as resurface a portion SR 253 in Decatur and Baker Counties, Georgia. The entire length of the project is 18.63 miles.

Baker County, GA 2002
10747 Fleming, Sherry Archaeological Assessment of Project OSAP-98-4(2), Lowndes County

"In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, and the Georgia Environmental Policy Act of 1991, project OSAP-98-4(2), Lowndes County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusio

Lowndes County, GA 1998
10748 Hart, Barry D. Archaeological Assessment of Project BRZLB-207(7), Monroe County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments, thereto, project BRZLB-207(7), Monroe County, has been surveyed with respect to archaeolog1cal resources, especially those on or eligible for inclusion in the National Register of Historic Pl

Monroe County, GA 1984
10749 Bowen, William R. Archaeological Surveys of County Bridge Projects-- All Districts BRS-1077(2), Monroe County

Project BRS-1077 (2) Monroe County consists of the replacement of the existing bridge and approaches over Tobesofkee Creek on Old Zebulon Road. The new structure will be located in approximately the same location as the existing bridge.

Monroe County, GA 1978
10750 Erickson, Luke W. Archaeological Assessment of the Hall County Resurfacing Project

Archeological Assessment of the Hall County Resurfacing Project. This proposed project is 9.138 miles in length and consists of leveling, resurfacing, shoulder building, permanent striping, and spot patching of SR 52 beginning at the Hall/Lumpkin County line and extending to SR 283.

Hall County, GA 2003