Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
10723 Erickson, Luke W. Archaeological Assessment of Project NHS-M001-00(992), Catoosa County

Archeological Assessment of Project NHS-M001-00(992), Catoosa County. This project consists of deck replacement/hydro-demolition and overlay on two bridges located on 1- 75 in Catoosa County. The bridge on 1-75 over CR 15/Scruggs Road is located 3.6 miles NE of Fort Oglethorpe.

Catoosa County, GA 2003
10724 Erickson, Luke W. Archaeological Assessment of a Muscogee County Resurfacing Project

Archeological Assessment of a Muscogee County Resurfacing Project. This project consists of the milling, patching, leveling, resurfacing, and shoulder building of SR 22 beginning at M.P. 9.22 and ending at M.P. 18.92. All work will take place within the existing right-of-way.

Muscogee County, GA 2005
10725 Erickson, Luke W. Archaeological Assessment of a Decatur County Resurfacing Project

Archeological Assessment of a Decatur County Resurfacing Project. This project proposes to level and resurface SR 241 beginning at the Florida/Georgia State Line and ending at SR 1BU/Attapulgus Bypass. All work will take place within the existing right-of- way, with no new right-of-way required.

Decatur County, GA 2005
10726 Fernandez-Sardina, Ricardo Assessment of Project PR-99(029), Bryan County

"In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto and the Georgia Environmental Policy Act (GEPA), project PR-99(029), Bryan County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in t

Bryan County, GA 1993
10727 Erickson, Luke W. Archaeological Assessment of a Jackson County Resurfacing Project

Archeological Assessment of a Jackson County Resurfacing Project. This proposed project is the leveling and resurfacing of SR 15/US 441 from SR 334 to the Banks County Line. All work will take place within the existing right-of-way with no new right-of-way required.

Jackson County, GA 2005
10728 Erickson, Luke W. Archaeological Assessment of a Bibb County Resurfacing Project

Archeological Assessment of a Bibb County Resurfacing Project. This project consists of the milling, resurfacing, patching, and shoulder building on SR 19, beginning at its intersection with Pio Nono Avenue/SR 247 (M.P.

Bibb County, GA 2005
10729 D'Avino, Gail A. Project STP-00MS(228), Taylor County: Determination of Undertaking

The subject· project would consist of leveling and resurfacing of SR 127 in Taylor County. The project would begin at the intersection of US 19/SR 3 (MP 13.65) and would extend west to end at the Macon County line (MP 20.93).

Taylor County, GA 1997
10730 Lotti, Teresa Ann Archaeological Assessment of Project STP-M001-00(73), Miller and Early Counties

Archaeological Assessment of Project STP-MOOl-00(773), Miller and Early Counties, paving two feet of existing shoulder on each side of SR 45, as well as resurface a portion SR 45 and 45 Connector in Miller and Early Counties, Georgia. The entire length of the project is 18.32 miles.

Early County, GA 2002
10731 McIntosh, Paul Archaeological Assessment of Project STP-M000-00(345), Lanier and Clinch Counties

Archaeological Assessment of Project STP-M000-00(345), Lanier and Clinch Counties, Milling, grooving and resurfacing 2 foot left and right along State Route 37, from the intersection of US 129 eastward to US 84 for a total length of 14.55 miles.

Clinch County, GA 2000
10732 D'Avino, Gail A. Project STP-054-1(59), Newton County: Determination of No Undertaking for History and Archaeology

The subject project would consist of the leveling and resurfacing of SR 81 beginning at Washington Street

(log 00.000) and extending in a northerly direction to end at a paving joint just north of Soule Street (log

Newton County, GA 1997