Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
13871 Wackett, Joshua, Beazley, Matthew Proposed 320-Foot Self-Supporting Telecommunications Structure (Overall Height with Appurtenances) Within 100-foot by 100-foot (30m by 30m) Lease Area GSL03046 (FA# 14996925)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Burke 2020
13872 Wackett, Joshua, Beazley, Matthew Proposed 260-Foot Self-Supporting Telecommunications Structure (Overall Height with Appurtenances) Within 100-Foot by 100-Foot (30m by 30m) Lease Area GSL01520 (FA# 15000520)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Pike 2020
13873 Scaife, William R. Resaca Civil War Battlefield General Interpretive Plan

This document was conceived as a guide to developing the fallow site of the Battle of Resaca (1864) into a comprehensive center for interpreting the event, the Atlanta Campaign, and, to some degree, the Civil War.

Gordon 2001
13874 Horne, Zach Cultural Resources Survey of the “DAMASCUS_CHURCH_RD-A” Monopole Tower Telecommunication Facility, Cleveland, White County, Georgia Trifleaf #647094

Proposed monopole tower telecommunication facility located in White County, Cleveland, Georgia (Latitude: 34° 37’ 2.54” Longitude: -83° 52’ 1.63”).

White 2019
13875 Rich, Cori Elise, Horne, Zach Cultural Resources Survey of the “BAKERY-B” collocation, Thomasville, Thomas County, Georgia Trileaf #656413

In November 2019, Trileaf Corporation (Trileaf) performed a cultural resource inventory survey for a proposed collocation located in Thomas County, Thomasville, Georgia (Latitude: 31° 50' 13.37” Longitude: -83° 58' 56.54”).

Thomas 2019
13876 Jackson, Paul D., Carruth, Amy S. A Phase I Archaeological Direct Effects and Visual Effects Survey for the Proposed Webbs Creek-E Cellular Tower, Banks County, Georgia

TerraXplorations, Inc. (TerraX) of Mobile, Alabama was contracted by Trileaf Corporation of Marietta, Georgia to conduct a Phase I archaeological direct effects survey and a visual effects survey for the proposed WEBBS CREEK-E cellular tower in Banks County, Georgia.

Banks 2019
13877 Chancellor, Mark D. Assessment of Adverse Effect to the Abandoned Central of Georgia Rail Corridor, Project STP-4067(2), P.I. # 550590

The proposed project involves constructing an interchange at I-16 and Pooler Parkway approximately 4.1 km (2.6 miles) west of I-95, and extending Pooler Parkway from its current terminus at U.S. Highway 80 to Quacco Road (Figures 1 and 2).

Chatham 1998
13878 Mathews, David An Archaeological and Historical Survey of the Proposed Toccoa Industrial Park Addition

In reference to the environmental impact study for the prosed addition to the Toccoa industrial park, a survey for archaeological and historic sites was undertaken by me for the Laboratory of Archaeology at Georgia State University.

Stephens 1974
13879 Stanfield, Tal, Entorf, Bob P. Cultural Resources Survey for DPI-0010(001), CT 18, Dekalb County

The proposed project would install surveillance cameras, conduit and fiber optic cable on existing utility poles within existing right-of-way (r-o-w) along Memorial Drive/SR 10 from Kensington Road east to the Gwinnett county line and along North Druid Hills Road from Clairmont Road/US 23 east to

DeKalb 1995
13880 O'Grady, Patricia D., Morgan, John R., Crook, Morgan Raymond Archaeological Assessment of Capital Outlay Projects, SFY 83 Cloudland Canyon State Park Projects #8-180, #8-750, #8-766

In accordance with the Parks and Historic Sites Capital Outlay Projects SFY 83 planned development, an archaeological survey was carried out at Cloudland Canyon State Park on August 23 and 24, 1982.

Dade 1982