Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
14397 Sanchez, Eric ARCHAEOLOGICAL RECORDS CHECK & PHASE IA ARCHAEOLOGICAL RECONNAISSANCE FOR THE PROPOSED TWISTER GAC076 TELECOMMUNICATIONS TOWER IN JACKSON COUNTY, GEORGIA.

In response to a request from Ignite Wireless, Inc., RESCOM Environmental Corp (RESCOM)., has completed a Phase Ia archaeological reconnaissance and records check for a proposed telecommunications tower site in Jackson County, Georgia (Figure 1).

Jackson County, GA 2021
14398 Sweeney, Alexander Y., Stallings, Patricia F. Cultural Resources Survey and Assessment of Effect of the Sea Point Industrial Complex

Between May 11 and 15, 2020, Brockington completed a cultural resources survey and an Assessment of Effects (AOE) for the SeaPoint Industrial tract in Savannah, Chatham County, Georgia.

Chatham County, GA 2020
14399 Jackson, Paul D. A PHASE I ARCHAEOLOGICAL DIRECT EFFECTS AND VISUAL EFFECTS SURVEY FOR THE PROPOSED MARTIN LUTHER CELLULAR TOWER, MUSCOGEE COUNTY, GEORGIA

TerraXplorations, Inc.

Muscogee County, GA 2017
14400 Davis, Valerie, Botwick, Brad, Windham, R. Jeannine Phase I Archaeological Survey of the Bainbridge Riverwalk

New South Associates completed the Phase I Archaeological Survey for the Bainbridge Riverwalk project in response to a request from York & Associates Engineering.

Decatur County, GA 2012
14401 Whitacre, Stacey R. Phase I Cultural Resources Survey of the Banks Crossing-Gordon Farms 115kV Transmission Line

Between March 1 and 5, 2021, Brockington and Associates, Inc.

Banks County, GA 2021
14402 Whitacre, Stacey R. Phase I Cultural Resources Survey of the Waycross-Brunswick Highway Substation

Between April 29 and May 12, 2021, Brockington and Associates, Inc.

Glynn County, GA 2021
14403 Radke, Casey, DuBois, Autumn Section 106 Review TCNS ID #184444 Proposed 199-foot Monopole Telecommunications Structure (Overall Height Including Appurtenances)

Environmental Corporation of America's (ECA) client, TowerCom V, LLC is proposing to construct a telecommunications facility as described in the following FCC Form 620, New Tower (NT) Submission Packet.

Rockdale County, GA 2019
14404 Piscitelli, Matthew, Harrell, Bryan C. PHASE I CULTURAL RESOURCE SURVEY FOR THE BUFORD DAM ROAD RELOCATION AND ADJACENT TIMBER SALE AREA, LAKE SIDNEY LANIER, FORSYTH AND GWINNETT COUNTIES, GEORGIA

Between 9 September 2019 and 18 September 2019, SEARCH completed a Phase I cultural resource survey for the Buford Dam Road relocation and adjacent timber sale area at Lake Sidney Lanier in Forsyth and Gwinnett counties, Georgia.

Forsyth County, GA 2019
14405 Eberwine, James, Stitcher, David Addendum Report: Phase I Cultural Resources Survey of an Access Road Associated with the Southern Natural Gas Mid-State Energy Access Road Project

The survey area measured approximately 250 x 10 m in size and it extended north from Loraine Forest Road to the proposed Mid-South Meter Station. The proposed access road was in a wooded area west of an existing pipeline corridor.

Monroe County, GA 2021
14406 Webb, Robert S. PHASE I ARCHEOLOGICAL RESOURCES SURVEY RAW WATER HOLDING POND TRACT AND ASSOCIATED USE AREAS

In May 2021, R.S. Webb & Associates conducted a Phase I archeological resources survey for the City of Carrollton’s 20.6 hectare (51-acre) proposed raw water holding pond site and associated use areas in Carrollton, Carroll County, Georgia.

Carroll County, GA 2021