Report Number Author(s) Title Abstract Summary County Year
14422 Handley, Brent M., Kosmalski, Emily A CULTURAL RESOURCE ASSESSMENT SURVEY OF THE JACKSON COUNTY FIRE STATION 12 PUBLIC SAFETY COMMUNICATION TOWER

On July 13, 2021, Terracon Consultants, Inc. conducted a cultural resource assessment survey the Jackson County Fire Station 12 Public Safety Communication Tower tract, located in Jackson County, Georgia (Figure 1.1).

Jackson 2021
14423 Heller, Abigail PHASE I ARCHAEOLOGICAL SURVEY AND CULTURAL RESOURCES REPORT FOR IMPACT7G, INC.

This report documents the results of the cultural resources survey for Impact7G, Inc. Project CS 230 - GSL05386, located in Coffee County, Georgia.

Coffee 2021
14424 Heller, Abigail, Newcomb, Elizabeth PHASE I ARCHAEOLOGICAL SURVEY AND CULTURAL RESOURCES REPORT FOR IMPACT7G

This report documents the results of the cultural resources survey for Impact7G Project CS 196 - GNL01014, located in Henry County, Georgia.

Henry 2021
14425 Whitacre, Stacey R. Phase I Cultural Resources Survey of the Gravelly Creek Substation

Between March 1 and 5, 2021, Brockington and Associates, Inc.

Jackson 2021
14426 Smith, Andrew M. PHASE IA ARCHAEOLOGICAL RECONNAISSANCE & RECORDS CHECK FOR THE PROPOSED GAC059 MONOPOLE SITE IN MARTINEZ, COLUMBIA COUNTY, GEORGIA.

In response to a request from Ignite Wireless, Inc., RESCOM Environmental Corp (RESCOM)., has completed a Phase Ia archaeological reconnaissance and records check for a proposed monopole tower site in Columbia County, Georgia (Figure 1).

Columbia 2021
14427 Sanchez, Eric ARCHAEOLOGICAL RECORDS CHECK & PHASE IA ARCHAEOLOGICAL RECONNAISSANCE FOR THE PROPOSED WHIRLAWAY GAC057 TELECOMMUNICATIONS TOWER SITE IN DECATUR COUNTY, GEORGIA.

In response to a request from Ignite Wireless, Inc., RESCOM Environmental Corp (RESCOM)., has completed a Phase Ia archaeological reconnaissance and records check for a proposed telecommunications tower site in Decatur County, Georgia (Figure 1).

Decatur 2021
14428 Webb, Robert S. PHASE I CULTURAL RESOURCES SURVEY IMPROVEMENTS TO SETTINGDOWN CREEK DAM NO. 4 FORSYTH COUNTY, GEORGIA

On June 17, 2020, R.S. Webb & Associates (RSWA) conducted a Phase I cultural resources survey of Settingdown Creek Dam No. 4 and associated areas of improvement covering approximately 3.6 hectares (9.0 acres).

Forsyth 2020
14429 Sanchez, Eric ARCHAEOLOGICAL RECORDS CHECK & PHASE IA ARCHAEOLOGICAL RECONNAISSANCE FOR THE PROPOSED PIGA523 TELECOMMUNICATIONS TOWER SITE IN BERRIEN COUNTY, GEORGIA.

In response to a request from T-Squared Site Services, LLC, RESCOM Environmental Corp (RESCOM)., has completed a Phase Ia archaeological reconnaissance and records check for a proposed telecommunications tower site in Berrien County, Georgia (Figure 1).

Berrien 2021
14430 Rich, Cori Elise, Bean, Colin Cultural Resources Survey of the SALEM ZION – A Telecommunication Project

In June 2021, Trileaf Corporation (Trileaf) performed a cultural resource inventory survey for a proposed self-support lattice communications tower located in Lincoln County, Lincolnton, Georgia Latitude: 33° 

Lincoln 2021
14431 Peltier, Robert, Capirci, Arianne Summary of Phase I Cultural Resource Investigations Project No. 212IC-BF-00222

Viasat, Inc. (Viasat) proposes to construct, operate, and maintain a new satellite earth station (satellite) not to exceed 6.1 meters (m) (20 feet [ft]) in height, located in Appling County, Georgia (Project).

Appling 2021