Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
14462 Gengenbach, Barbara, Green, William, Brown, Jonathan, Gordon, Marnie Phase I Archaeological Survey of the East Hightower Trail Sidewalk Installation

Terracon Consultants, Inc., (Terracon), on behalf of Keck and Wood, Inc., and the Georgia Department of Transportation (GDOT) has completed a Phase I Archaeological Survey for a proposed sidewalk installation on East Hightower Trail in Social Circle, Walton County, Georgia (GDOT

Walton 2021
14463 Bright, Kaitlyn, Moss, Richard A. Phase I Archaeological Survey of the Proposed Bridge Replacement on SR 80 over the Little River in McDuffie, Warren, and Wilkes Counties

The proposed project would consist of the replacement of the Georgia Department of Transportation (GDOT) Bridge, Structure ID 189-0031-0, on State Route (SR) 80 over the Little River in McDuffie, Warren, and Wilkes counties (Figure 1).

McDuffie 2021
14464 LaForge, Travis B. Phase I Archaeological Survey for the Proposed Bridge Replacement at SR 8 Over Jackson Creek, Gwinnett County, Georgia

The proposed project consists of the replacement of the State Route (SR) 8 bridge over Jackson Creek in the City of Lilburn in Gwinnett County.

Gwinnett 2021
14465 Keith, Scot J. Phase I Archaeological Survey for Signal Upgrades at One Location on I-20 and Nine Locations along SR 139 (Martin Luther King, Jr. Drive SW)

The Georgia Department of Transportation (GDOT) plans to make improvements to signals at one location on I-20 and nine locations along SR 139 (Martin Luther King, Jr. Drive SW) in Fulton County, Georgia under GDOT P.I. No. 0013211. New South Associates, Inc.

Fulton 2021
14466 Hinson, Lindsey, Bright, Kaitlyn, Tarleton, Matthew Phase I Archaeological Survey in Advance of the Culvert Replacement on SR 36 over Big Sandy Creek, Butts County, Georgia

The proposed project would replace the existing culvert on State Route (SR) 36 at Big Sandy Creek. The culvert, Structure ID 035-5055-0, constructed in 1954, consists of three steel plate pipes.

Butts 2021
14467 Zoino, Jayson Phase I Archaeological Survey of the Proposed Bridge Replacement of Bridge ID # 301- 5011-0 in Warren County, Georgia

In accordance with the Georgia Department of Transportation (GDOT) Low Impact Bridge Program (LISP), a potential bridge replacement has been identified along County Road (CR) 56/Ogeechee River Road (hereinafter referred to as Ogeechee River Road) that spans Long Creek.

Warren 2021
14468 Ahern, Kaitlin Seventh Addendum to the Phase I Archaeological Survey of the I-285 Top End Express Lanes Project, Cobb, DeKalb, and Fulton Counties, Georgia

The proposed project consists of an advanced acquisition of a land parcel (Parcel 160 at 2861 North DeKalb Drive, Doraville, GA 30340) in DeKalb County, Georgia to prevent imminent development that would increase the cost or limit futu

DeKalb 2021
14469 Jennings, Lisa, Lewis, Clifford Thomas Third Addendum Phase I Archaeological Survey for Advanced Signage in Six Locations on I-285 and SR 400, Fulton County, Georgia

Six new signage structures are proposed along Interstate (I-) 285 and State Route (SR) 400, in Fulton County, Georgia. Advanced roadway signage requirements were evaluated by the Design-Build-Finance (DBF) team for areas beyond the project APE.

Fulton 2021
14470 Longacre, Emily Phase I Archaeological Survey for the Proposed SR 106 Bridge Replacement at Middle Fork Broad River in Franklin County, Georgia

The project consists of replacing the existing State Route (SR) 106 bridge over the Middle Fork Broad River. The project is located in Franklin County.

Franklin 2021
14471 Schnitzer, Laura Kate, Gentil, Verna Fourth Addendum to a Phase I Archaeological Survey of the Proposed Widening and Reconstruction of SR92/Dallas Acworth Highway from Old Burnt Hickory Road in Paulding County to US 41/SR 3/Cobb Parkway in Cobb County, Georgia

The projects propose to widen SR 92/Dallas Acworth Highway (Hwy) from Old Burnt Hickory Road (Rd) to US 41/SR 3/Cobb Parkway (Pkwy) from two lanes to a divided four-lane facility with one 11-foot (ft) {3.4 meters [ml) and one 12-ft (3.

Cobb 2021