Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
14477 Dobbs, David Phase I Intensive Cultural Resources Survey of the Riverwatch Parking Tract

Between July 20 and 24, 2020, Brockington and Associates, Inc. (Brockington) conducted a Phase I Cultural Resources Survey for the Riverwatch Parking Tract in Richmond County, Georgia.

Richmond County, GA 2020
14478 Kosalko, Katherine Third Addendum Phase I Archaeological Survey for the Proposed SR 25 Spur East at Mackay River Bridge Replacement, Glynn County, Georgia

The proposed project would consist of replacing the existing bridge on State Route (SR) 25 Spur East (County Road [CR] 582/Torras Causeway) over the Mackay River 4.8 kilometers (km) (3 miles [mi]) east of Brunswick, Georgia (Figure 1).

Glynn County, GA 2021
14479 Perash, Rachel Phase I Cultural Resources Survey for the Relocation of Structure 48 on the Dirt Road-Riggins Mill Road 115 kV Transmission Line (Macon TMC) Project, Bond Swamp National Wildlife Refuge

On September 2, 2021, Brockington and Associates, Inc.

Twiggs County, GA 2021
14480 Abbott, David Second Addendum to the Phase I Archaeological Survey of Sigman Road Improvements, Rockdale County, Georgia

The proposed project would consist of the widening and improvements of Sigman Road (County Road [CR] 435) from east of Lester Road to Dogwood Connector in the central portion of Rockdale County, Georgia, 

Rockdale County, GA 2021
14481 Carlock, Michael D., Keef, Ashlyn Addendum to the Phase I Archaeological Resources Survey of the Proposed Bridge Replacement at County Road 157/Findley Road over I-75, Dooly County, Georgia

Dooly County, GA 2021
14482 Jennings, Lisa, Tarleton, Matthew Second Addendum Phase I Archaeological Survey for the Proposed SR 385 at Hazel Creek in Demorest Bridge Replacement, Habersham County, Georgia

The proposed project would replace the State Route (SR) 385/United States (US) 441 Business (SR 385) bridge, Structure ID 137-0006-0, over Hazel Creek in the city of Demorest, Georgia. The project length would be approximately 0.45 kilometers (km) (0.28 mile [mi]).

Habersham County, GA 2021
14483 Carey, Travis, Blackwelder, Jon R. Phase I Archaeological Survey of Pedestrian Upgrades at 21 Locations in Floyd County, Georgia

The Georgia Department of Transportation (GDOT) Project P.I. No. 0013690 is a pedestrian upgrades project for 21 locations in Floyd County, Georgia.

Floyd County, GA 2021
14484 Trudeau, Mary F. Addendum Phase I Archaeological Survey for the North Oconee River Bridge Project, Clarke County, Georgia

The proposed project would replace the existing bridge on State Route (SR) 10/United States Highway (US) 78 over the North Oconee River in the City of Athens, Georgia (Figure 1).

Clarke County, GA 2021
14485 Pappas, Andrew A. Addendum to a Phase I Archaeological Resources Survey of the CR 742/Bass Road Bridge Replacement Over the Norfolk Southern Railroad, Bibb County, Georgia

The Georgia Department of Transportation (GDOT) Project PI No. 0014896 would replace the bridge on County Road (CR) 742/Bass Road over the Norfolk-Southern Railroad in Bibb County, Georgia (Figure 1).

Bibb County, GA 2021
14486 Partridge, Colin Phase I Cultural Resource Investigation and Phase II Testing of Two Archaeological Sites on the Odum Old River Road Tract

Between November 11 and November 15, 2021, Brockington and Associates, Inc. (Brockington) conducted a Phase I cultural resources survey of 40-acres along Old River Road outside Meldrim in Effingham County, Georgia.

Effingham County, GA 2021