Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
14452 DeCaro, Alexander J. Underwater Archaeological Investigation of the Chattahooche River Under the Interstate 20 Bridge for the I-285/I-20 Interchange Reconstruction and Widening Project, Cobb and Fulton Counties, Georgia

The Georgia Department of Transportation (GDOT) is planning to improve the Interstate 20 (I-20) and Interstate 285 (I-285) West interchange in the City of Atlanta, Cobb, Fulton, and Douglas Counties, Georgia (GDOT PI No. 0013918).

Cobb County, GA 2020
14453 Woodliff, John Dylan, Lewis, Clifford Thomas Seventh Addendum Phase I Archaeological Survey for the Widening and Improvements of State Route (SR) 61 From South of County Road (CR) 467/Dallas Nebo Road to SR 6, Paulding County, Georgia

Edwards-Pitman Environmental, Inc.

Paulding County, GA 2021
14454 Carey, Travis, Jennings, Lisa Phase I Archaeological Survey for State Route 520/US 280 at County Road 66/ Red Hill

The proposed project fixes a washout area adjacent to State Route (SR) 520 located about 6.4 kilometers (km) (4 miles [mi]) north of Richland in Stewart County, Georgia.

Stewart County, GA 2021
14455 Pokrant, Marie E., Wise, Robert P. Phase I Archaeological Survey of the SR 74 at SR 42 Roundabout, Monroe County, Georgia

To improve safety and traffic flow, GDOT proposes to improve the intersection of SR 74 at SR 42 with a one-lane roundabout with 12-foot lanes in both directions along SR 74. SR 74 is classified as a Rural Minor Arterial, and SR 42 is a Rural Major Collector.

Monroe County, GA 2021
14456 Moss, Richard A. Phase I Archaeological Survey of Proposed Improvements at SR 53/Hog Mountain Road and CR 99/Rays Church Road and CR 516/Malcolm Bridge Road, Oconee County, Georgia

Edwards-Pitman, Inc.

Oconee County, GA 2021
14457 Quirk, Phillip W. Phase I Archaeological Resource Survey of the Proposed Expansion of CR 422/Jeff Davis Road at Ten Mile Creek Upson County, Georgia

On October 12 and 13, 2020, HNTB completed a Phase I archaeological resources survey for a proposed bridge replacement of County Road (CR) 422/Jeff Davis Road over Ten Mile Creek, in Upson County, Georgia.

Upson County, GA 2021
14458 Hinson, Lindsey Phase I Archaeological Survey in Advance of the Bridge Replacement on CR 229/Valentine Industrial Parkway over I-85, Jackson County, Georgia

Edwards-Pitman, Inc. (EP) completed a Phase I archaeological survey for the County Road 229 (CR 229)/Valentine Industrial Parkway over Interstate 85 (I-85) bridge replacement project in Jackson County, Georgia (PI No. 0016523 and HP No. 210428-001).

Jackson County, GA 2021
14459 Blackwelder, Jon R. Phase I Archaeological Survey for a Proposed Bridge Replacement on CR 197/Big Cedar Road at Rocky Creek, Wilkes County, Georgia

The proposed project would replace the existing bridge (Structure ID 317-5034-0) on County Road (CR) 197 (Big Cedar Road) over Rocky Creek in Wilkes County, Georgia.

Wilkes County, GA 2021
14460 Southard, Elizabeth A Phase I Archaeological Survey for a Proposed CS 223/Portal Highway at Fifteenmile Creek and Overflow, Candler County, Georgia

The proposed projects would replace two existing bridge structures on County Road (CR) 223 over Fifteenmile Creek (bridge Structure ID 043-0031-0) and its adjacent overflow (bridge Structure ID 043-0030) in Candler County, Georgia. These projects are associated with PI Nos.

Candler County, GA 2021
14461 Parking, Sara Mackenzie A Phase I Archaeological Survey for a Bridge Replacement on CR 222/CR 954/County Line Rd. at Potato Creek, Spalding and Lamar Counties

The proposed project would replace the existing two-lane 60 foot-long bridge (serial ID 255-0036-0) on County Road (CR) 222/CR 954/County Line Road over Potato Creek, 3 miles southeast of Griffin, GA. The typical section of the replacement bridge is yet to be determined.

Spalding County, GA 2021