Back to top

Abbott, David

Report Number Author(s) Title Abstract Summary County Year
10975 Abbott, David Phase I Archaeological Survey of the Proposed Cochran Road at Camp Creek Bridge Replacement in Fulton County, Georgia

Georgia Department of Transportation Project (GDOT) P.l. No. 0015530 consists of a bridge replacement along Cochran Road located over Camp Creek in South Fulton, Georgia. Existing right-of-way (ROW) is 60 feet and all work would occur within existing ROW to include the bridge replacement.

Fulton 2018
12595 Abbott, David Pleasant Hill Road Widening at Chattahoochee River

The Pleasant Hill Road Widening at Chattahoochee River to McClure Bridge Road project is a Gwinnett County Department of Transportation project (P.I. No. F-0035) with the overall purpose of expanding the existing road to alleviate increased traffic flow.

Gwinnett 2005
13868 Abbott, David A Phase I Archaeological Survey of SAS-2013-00623, Little Road Widening Project Cherokee County, Georgia

The proposed project would consist of roadway improvements along Little Road from Hickory Road to Vaughn in Canton, Cherokee County, GA. The existing road conditions do not meet current design standards. The proposed project would widen Little Road to provide two (2)-10 foot lanes.

Cherokee 2019
14363 Abbott, David Tuckahoe Wildlife Management Area Proposed Firebreak Maintenance Metal Detector Survey Screven County, Georgia

The Georgia Department of Natural Resources (D R) plans to maintain 3.2 miles of existing firebreaks within the state-owned Tuckahoe Wildlife Management Area in Screven County, Georgia (Figure I and Figure 2).

Screven 2021
14480 Abbott, David Second Addendum to the Phase I Archaeological Survey of Sigman Road Improvements, Rockdale County, Georgia

The proposed project would consist of the widening and improvements of Sigman Road (County Road [CR] 435) from east of Lester Road to Dogwood Connector in the central portion of Rockdale County, Georgia, 

Rockdale 2021
14507 Abbott, David Phase I Archaeological Survey of SR 154/SR 166 FROM I-85 TO I-285, Fulton County, Georgia

The purpose of the project is to upgrade the existing lighting poles/fixtures along the State Route (SR) 154/SR 166 corridor between I-285 and I-85. The speed limit within the project corridor was originally 45 miles per hour (mph).

Fulton 2021
14556 Burt, Hillary, Abbott, David, Davis, Alexander A Phase I Archaeological Survey of the Proposed Elmer Road Stabilization, Wayne County, Georgia

On April 30, 2021, Atlas Technical Consultants conducted an archaeological survey of Elmer Road right-of-way (ROW) within the 100-meter wetland impact area of a proposed Elmer Road stabilization in Wayne County, Georgia.

Wayne 2021
14567 Abbott, David Phase I Archaeological Survey of the Proposed US-27/SR-1 Bridge Replacement at Big Dry Creek

Moreland Altobelli Associates, LLC (MA) performed a Phase I archaeological survey for the proposed US-27/SR-I Bridge Replacement at Big Dry Creek in Floyd County, Georgia in August 

Floyd 2019
14696 Abbott, David FEMA Project PA-04-GA-4579-PW-0074, Lumpkin County, Georgia

During the incident period (10/28/2020 through 10/29/2020), Hurricane Zeta deposited 2,772 Cubic Meters (3,625 Cubic Yards) of vegetative debris throughout Lumpkin County.

Lumpkin 2022
Displaying 1 - 9 of 9