Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
9505 Weed, Carol S., Carlock, Michael D. Addendum Survey of the Phase I Cultural Resources Survey of SR 38 / US 84 Widening, Clinch and Ware Counties, Georgia

The proposed project would widen and realign SR 38/US 84 through Clinch and Ware Counties, in southeast Georgia.

Clinch 2017
9506 Falvey, Lauren W. Phase I Archaeological Survey of Proposed Intersection Improvements, Sr 38 / US 84 / Oglethorpe Highway at CR 73 / Old Sunbury road and CR 75 / Old Hines Road in Flemington, Liberty County, Georgia

The proposed project would take place on State Route (SR) 38/ US 84/ Oglethorpe Highway in Flemington, GA approximately 2 miles east of Hinesville.

Liberty 2016
9507 Keith, Scot J. Phase I Archaeological Survey, Off-System Safety Improvements at Three Locations, DeKalb County, GA

For this safety action project, the Georgia Department of Transportation (GDOT) proposes safety improvements along three roads in DeKalb County, totaling about 7.97 miles. All of the work for this project will take place within the existing right-of-way (ROW).

DeKalb 2016
9508 Quirk, Phillip W. Phase I Archaeological Survey for Bridge 243-5024-0, County Road 27 over Pumpkin Creek, Randolph County, Georgia

The Georgia Department of Transportation (GDOT) has developed a Low Impact Bridge program (LIBP) to provide expedited project delivery for the least complicated type bridge replacement projects.

Randolph 2017
9509 Keith, Scot J. Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 145-0052-0 Old West Point Road (CR 29) over Chattahoochee River Tributary, Harris County, Georgia

The project involves the replacement of the bridge carrying Old West Point Road (CR 29) over an unnamed tributary of the Chattahoochee River under GDOT’s Low Impact Bridge Program (LIBP) in Harris County (Attachment 1). The existing bridge is structurally deficient and will be replaced.

Harris 2016
9510 Keith, Scot J. Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 145-5003-0, Bethany Church Road (CR 2) over Turkey Creek Tributary , Harris County, Georgia

The project involves the replacement of the bridge carrying Bethany Church Road (CR 2) over a tributary of Turkey Creek in Harris County (Attachment 1). The project is included in GDOT’s Low Impact Bridge Program (LIBP). The existing bridge is structurally deficient and will be replaced.

Harris 2016
9511 Keith, Scot J. Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 145-5037-0, 0 Street (CR 248) over Palmetto Creek, Harris County, Georgia

The project involves the replacement of the bridge carrying 0 Street (CR 248) over Palmetto Creek under GDOT’s Low Impact Bridge Program (LIBP) in Harris County (Attachment 1). The existing bridge is structurally deficient and will be replaced.

Harris 2016
9512 Bazzill, Dina M. G8303 (Cooperville) TCNS ID 134442 5773 Statesboro Highway Sylvania, Screven County, Georgia ECA Project No. R1621

Environmental Corporation of America’s (ECA) client, Southern Communications Services, d/b/a SouthernLINC Wireless c/o Value Concepts, Inc., is proposing to construct a communications facility as described in the following FCC Form 620, New Tower (NT) Submission Packet.

Screven 2016
9513 DuBois, Autumn, Vargas, Jessica TCNS ID 136030 Tifton Operating Headquarters Bruce Lane Tifton, Tift County, Georgia ECA Project No. S0416

Environmental Corporation of America’s (ECA) client, Georgia Power Company, is proposing to construct a communications facility as described in the following FCC Form 620, New Tower (NT) Submission Packet.

Tift 2016
9514 Perrine, Rachel Archaeological Assessment of a Proposed Resurfacing, pavement Marking, and Traffic Signal Modification project along State Route 9 / US Highway 19 / Peachtree Road in Fulton County, Georiga

The proposed project would consist of pavement resurfacing and restriping and traffic signal modifications along a roughly 2.9-mile section of State Route (SR) 9 / U.S.

Fulton 2016