8923 Koch, Christopher P. GDOT Surplus Property GEP-089-6288

The proposed project would consist of the sale of surplus property currently owned by the Department.  The subject parcel contains approximately 0.48-acre and is adjacent to, and north of, US 278, approximately 650 feet west of the intersection of US 278, to the south of the property, and Sw

Jackson County, GA 1993
8925 Koch, Christopher P. I-75/Windy Hill Road Interchange Improvements

The original 2011 project scope improved Windy Hill Road between US 41/Cobb Parkway and Spectrum Circle/Interstate North Parkway. The scope of this project was reduced from 1.37 miles to 0.21 mile along Windy Hill Road.

Jackson County, GA 1986
8929 Koch, Christopher P. Parking Lots Associated with US 41 Widening from Paces Mill Road to Akers Mill RoadParking Lots Associated with US 41 Widening from Paces Mill Road to Akers Mill Road

The originally proposed project would widen and reconstruct Cobb Parkway (US 41 ), an urban principal arterial, from Paces Mill Road to Akers Mill Road. The existing roadway consists of four lanes with a variable width, two-way left-tum lanes, and right-tum lanes at most major intersections.

Cobb County, GA 2004
8939 Koch, Christopher P. SR 140/Holcomb Bridge Road at Warsaw Road

The proposed project would construct intersection improvements at the intersection of Warsaw Road and SR 140/Holcomb Bridge Road (see Figure 1).

Baldwin County, GA 2006
8944 Koch, Christopher P. GDOT Surplus Property GEP-089-770

The proposed project would consist of the sale of surplus property currently owned by the Department. The subject parcel contains approximately 1.0 acre and is on the north side of Chamblee-Tucker Road, west of Barkside Court. (Figure 1).

Liberty County, GA 2002
8948 Koch, Christopher P. GDOT Surplus Property GEP-097-57

The proposed project would consist of the sale of surplus property currently owned by the Department. According to the Department, the parcel is 0.47 acre. However, according to the Douglas County Tax Assessor's web page, the parcel is 0.41 acre.

Walton County, GA 1996
8951 Koch, Christopher P. GDOT Surplus Property GEP-223-125

The proposed project would consist of the sale of surplus property currently owned by the Department. According to the Department, the parcel is 1.05 acres.

Forsyth County, GA 2002
8983 Koch, Christopher P. Addendum to Phase I Survey to Replace Bridge (#199-0049-0) S.R. 109 over Red Oak Creek

This project was approved by GDOT in 2014 (Koch 2014). Since then, the project has changed.

Henry County, GA 2003
8990 Koch, Christopher P. Bridge Replacement on State Route 171 over Holton Creek

This project consists of the replacement of the structurally deficient bridge over Holton Creek on State Route 171 located 0.6 miles south of Kite in Johnson County. The length of the project will be 0.32 miles.

Bibb County, GA 1999
8994 Koch, Christopher P. Bridge replacements on SR 64 over Ten Mile Creek & Five Mile Creek

This project would replace the two existing bridges on SR 64.

Colquitt County, GA 2002