Back to top

Koch, Christopher P.

Report Number Author(s) Title Abstract Summary County Year
8178 Koch, Christopher P. Phase I Archaeological Survey for the Proposed Operational Improvement of SR 154/Campbellton Road at CR 472/Niskey Lake Road, Atlanta, Fulton County, Georgia

GT Hill Planners Corporation conducted a Phase I Archaeological Survey for the proposed improvements to the existing intersection of SR 154/Campbellton Road with CR 472/Niskey Lake Road in the City of Atlanta, Fulton County, Georgia.

Clayton County, GA 2012
8468 Koch, Christopher P. Hamilton-Palmetto Creek Trail Phase Ill & Walking Amenities Phase I

PI No. 371770, Harris County proposes to construct Phase 3 of a multi-use path to connect Phases 1 and 2 of the Palmetto Creek Walking and Bicycle Center from the City of Hamilton to the County Recreational Facility.

Floyd County, GA 2014
8536 Koch, Christopher P., Norwood, S. Lorraine Archaeological Survey for Proposed High Occupancy Vehicle Lanes on I-75 from Mount Zion Boulevard Clayton County to Crown Road Fulton County, Georgia

Terracon conducted a Phase I Archaeological Survey in preparation for the widening of 1-75 between Mt. Zion Boulevard, Clayton County and Crown Road, Fulton County in accordance with a contract from PBS&J and GDOT.

Laurens County, GA 2014
8548 Koch, Christopher P. Archaeological Survey for Proposed High Occupancy Vehicle Lanes From Thornton Road/SR 6 to Hamilton E. Holmes Road/SR 280, Douglas, Cobb and Fulton Counties, Georgia

Terracon conducted a Phase I Archaeological Survey in preparation for the widening of 1-20 between Thornton Road/SR 6, Douglas County and Hamilton E. Holmes Road/SR 280, Fulton County in accordance with a contract from Earth Tech and the Georgia Department of Transportation.

Columbia County, GA 2015
8652 Koch, Christopher P. Phase I Survey of the Proposed S.R. 82 Bridge Replacement, Jackson County, Georgia

The proposed project would consist of the replacement of the bridge carrying SR 82 Spur over the North Oconee River (see Figure 1. Project Location Map). The bridge would be replaced at its existing location and an off-site detour would be utilized during construction.

Lowndes County, GA 2010
8662 Koch, Christopher P. Phase I Archaeological Survey of the Proposed Intersection Realignment of Glenridge Drive

The proposed project would consist of the realignment of the existing intersection of Glenridge Drive with SR 9/Roswell Road, which currently consists of a three-legged intersection with a substandard skew (see Figure 1. Project Location Map).

DeKalb County, GA 2012
8713 Koch, Christopher P. Archaeological Survey for the Georgia Ports Authority (GPA) Rail Tie-in to the Mason Intermodal Container Transfer Facility (ICTF), Garden City Terminal

This project would install connecting tracks from the south end of the GPA's Mason ICTF to the Norfolk Southern Railway.

Pickens County, GA 2014
8722 Koch, Christopher P. Bridge Replacement on SR 16 at Little Shoulderbone Creek 8.6 Miles Northwest of Sparta

This project consists of the replacement of the structurally deficient 1959 bridge (Structure ID 141-0006-0) over Little Shoulderbone Creek on State Route 161ocated 8.6 miles northwest of Sparta in Hancock County. The length of the project would be 0.34 mile.

Fulton County, GA 2011
8725 Koch, Christopher P. Replace Bridge ( #199-0049-0) SR 109 over Red Oak Creek

The proposed project would consist of the replacement of the existing bridge carrying State Route (SR) 109 Spur over Red Oak Creek, approximately 2 miles southwest of the City of Gay, Georgia (see Figure 1). Traffic would be maintained on an off-site detour during project construction.

Tift County, GA 2014
8732 Koch, Christopher P. Proposed replacement bridge carrying US 411/SR 61 over the CSX Railroad

The proposed project would consist of the replacement of the bridge carrying US 411/SR 61 over the CSX Railroad (L&N Railroad), in the community of Tennga (see Figure 1).

Fulton County, GA 2015
Displaying 41 - 50 of 92