Pietak, Lynn Marie

Report Number Author(s) Title Abstract Summary County Year
3269 Silliman, Garrett W., Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of the Grimes Bridge Road Creek Project Area, Fulton County, Georgia

The proposed project would reconstruct the existing bridge on Grimes Bridge Road over Big Creek on the existing alignment.

Fulton 2005
3275 Pietak, Lynn Marie Phase I Archaeological Survey of the Covington Highway Sidewalks Project Area, Dekalb County, Georiga

The proposed project would consist of the construction of sidewalks and wheelchair ramps along both sides of Covington Highway from approximately 350 feet west of Memorial Drive to Redan Road in DeKalb County, Georgia.

DeKalb 2005
3278 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of US 221 over Town Creek, Jeff Davis County, Georgia

Original: The proposed project would replace the existing bridge over Town Creek with a new bridge approximately 120 feet long by 44 feet wide on existing alignment. The bridge would contain two 12-foot wide travel lanes with 10-foot wide shoulders.

Jeff Davis 2005
3282 Silliman, Garrett W., Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 27/US 280 over Lanahassee Creek, Webster County, Georgia

The design plans have been revised and the project length is now approximately 2,727 feet. This represents a reduction in project length of approximately 13 feet. The proposed bridge would be 235 feet long and 44 feet wide. The previous CE and Reevaluation proposed a 200-foot long bridge.

Webster 2005
3380 Pietak, Lynn Marie Phase I Archaeological Survey of Columbia Drive, Covington Highway, and Mountain Industrial Boulevard Signal Design Project Areas, DeKalb County, Georgia

This is a GDOT archaeological report short form for negative findings for a project that would consist of traffic signal at 32 intersections within DeKalb County, Georgia.

DeKalb 2003
3381 Pietak, Lynn Marie Phase I Archaeological Survey of Lavista Road, North Druid Hills Road, Chamblee Tucker Road and Lawrenceville Highway Signal Design Project Areas, DeKalb County, Georgia

The proposed project would consist of traffic signal upgrades at 37 intersections in DeKalb County.

DeKalb 2005
3382 Pietak, Lynn Marie Phase I Archaeological Survey of Peachtree Road, Peachtree Industrial Boulevard and Perimeter Summit Parkway Signal Design Project Areas, DeKalb County, Georgia

The proposed project would consist of traffic signal upgrades at 18 intersections in DeKalb County, Georgia.

DeKalb 2005
3386 Pietak, Lynn Marie Phase I Archaeological Survey of Simpson-W. Peachtree Rail Connection Project Area, Fulton County, Georgia

This is an archaeological report short form for negative findings for the proposed project would consist of improvements on Simpson Street between Centennial Olympic Park Drive and West Peachtree Street and on West Peachtree Street between Simpson Street and Alexander/Ralph McGill Boulevard.

Fulton 2005
3421 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Clayton County Signal System Design Project Areas, Clayton County, Georgia

The December 8, 2005 GDOT Archaeological Report Short Form for Negative Findings is an Addendum to Phase I Archaeological Survey of Clayton County Signal System Design Project Areas, Clayton County, Georgia.

Clayton 2005
3450 Pietak, Lynn Marie Phase I Archaeological Survey for the Proposed Noonday Creek Multi-Use Trail, Cobb County, Georgia

This GDOT archaeological report short form for negative findings for the Phase I Archaeological Survey for the Proposed Noonday Creek Multi-Use Trail, Cobb County, Georgia conducted by Edwards-Pitman Environmental, Inc.

Cobb 2005
Displaying 141 - 150 of 538